Removal and replacement procedures 21
Removal and replacement procedures
Required tools
You need the following items for some procedures:
•
T-10 Torx screwdriver
•
T-15 Torx screwdriver
•
HP Insight Diagnostics software ("
" on page
Preparation procedures
To access some components and perform certain service procedures, you must perform one or more of the
following procedures:
•
Power down the nodes ("
" on page
If you must remove the chassis from a rack or a non-hot-plug component from the chassis or node, then
you must power down the nodes.
•
Remove the nodes from the chassis ("
Remove a node from the chassis
" on page
If the rack environment, cabling configuration, or the chassis location in the rack creates unstable
conditions, then remove the node from the chassis.
•
Remove the access panel (on page
•
Install the access panel (on page
Power down the node
Before powering down the node for any upgrade or maintenance procedures, perform a backup of critical
server data and programs.
IMPORTANT:
When the node is in standby mode, auxiliary power is still being provided to the
system.
To power down the node, use one of the following methods:
•
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the node enters standby
mode.
•
Press and hold the Power On/Standby button for more than 4 seconds to force the node to enter
standby mode.
This method forces the node to enter standby mode without properly exiting applications and the OS.
If an application stops responding, you can use this method to force a shutdown.
•
Use a virtual power button selection through iLO.
Содержание ProLiant SL4545 G7
Страница 12: ...Customer self repair 12 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 17: ...Illustrated parts catalog 17 System components ...