Removal and replacement procedures 64
7.
Remove the FlexibleLOM adapter from the riser cage.
To replace the component, reverse the removal procedure.
System battery
If the server no longer automatically displays the correct date and time, then replace the battery that
provides power to the real-time clock. Under normal use, battery life is 5 to 10 years.
WARNING:
The computer contains an internal lithium manganese dioxide, a vanadium
pentoxide, or an alkaline battery pack. A risk of fire and burns exists if the battery pack is not
properly handled. To reduce the risk of personal injury:
•
Do not attempt to recharge the battery.
•
Do not expose the battery to temperatures higher than 60°C (140°F).
•
Do not disassemble, crush, puncture, short external contacts, or dispose of in fire or water.
•
Replace only with the spare designated for this product.
To remove the component:
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
o
Extend the server from the rack (on page
o
Remove the server from the rack (on page
4.
Remove the access panel ("
5.
If installed, remove any expansion boards ("
) installed in slot 1 and 2.
6.
Locate the battery on the system board ("
7.
Remove the battery.
Use a small flat-bladed, nonconductive tool to carefully remove the battery from the socket.
WARNING:
Do not exert too much force to remove the system battery. The battery could pop
out of the socket, or the tool could slip and damage the socket or the system board.
Содержание ProLiant DL60 Gen9
Страница 5: ...Contents 5 Documentation feedback 111 Index 112 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 23: ...Illustrated parts catalog 23 ...
Страница 33: ...Removal and replacement procedures 33 o Secondary PCI riser cage o PCI blank ...
Страница 95: ...Component identification 95 Fan locations ...
Страница 100: ...Cabling 100 FBWC module slot 3 cabling M 2 SSD cabling Slot 2 cable routing 2 ports supported when slot 1 is unoccupied ...
Страница 110: ...Acronyms and abbreviations 110 UID unit identification USB universal serial bus ...