4.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
5.
Do one of the following:
a.
Extend the server from the rack (
Extend the server from the rack
on page 24).
b.
Remove the server from the rack (
Remove the server from the rack
6.
7.
Install the secondary low-profile PCIe slot riser cage.
8.
Install one of the following, as needed:
• Expansion boards (
Installing an expansion board in the secondary riser cage
on page 77)
on page 82)
9.
Install the access panel (
on page 25).
10.
Install the server into the rack (
Installing the server into the rack
11.
Connect each power cord to the server.
12.
Connect each power cord to the power source.
13.
Power up the server (
on page 24).
Installing an expansion board in the secondary riser cage
Prerequisites
Before installing this option, be sure that you have the following:
The components included with the hardware option kit
Procedure
1.
Observe the following alerts:
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
Installing an expansion board in the secondary riser cage
77
Содержание ProLiant DL360 Gen10
Страница 75: ...9 Install the full height PCIe x16 riser cage latch 10 Install the riser cage Hardware options installation 75 ...
Страница 79: ... Full length 9 Install the expansion board Hardware options installation 79 ...
Страница 96: ... 4 LFF 9 Guide the SID cable through the front of the server 96 Hardware options installation ...