![HP ProLiant DL320 Generation 5 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/hp/proliant-dl320-generation-5/proliant-dl320-generation-5_user-manual_164687025.webp)
Setup 25
•
The leveling jacks are extended to the floor.
•
The full weight of the rack rests on the leveling jacks.
•
The stabilizing feet are attached to the rack if it is a single-rack installation.
•
The racks are coupled together in multiple-rack installations.
•
Only one component is extended at a time. A rack may become unstable if more than
one component is extended for any reason.
WARNING: To reduce the risk of personal injury or equipment damage when unloading
a rack:
•
At least two people are needed to safely unload the rack from the pallet. An empty
42U rack can weigh as much as 115 kg (253 lb), can stand more than 2.1 m (7 ft)
tall, and may become unstable when being moved on its casters.
•
Never stand in front of the rack when it is rolling down the ramp from the pallet.
Always handle the rack from both sides.
Identifying the server shipping carton contents
Unpack the server shipping carton and locate the materials and documentation necessary for installing the
server. All the rack mounting hardware necessary for installing the server into the rack is included with the
rack or the server.
The contents of the server shipping carton include:
•
Server
•
Printed setup documentation, Documentation CD, and software products
•
Power cord
•
Rack mounting hardware kit and documentation
In addition to these supplied items, you may need:
•
Application software CDs or diskettes
•
Options to be installed
•
Phillips screwdriver
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
Installing the server into the rack
To install the server into a rack with square, round, or threaded holes, refer to the instructions that ship
with the rack hardware kit.
If you are installing the server into a telco rack, order the appropriate option kit at the RackSolutions.com
http://www.racksolutions.com/hp
). Follow the server-specific instructions on the website to install
the rack brackets.
Use the following information when connecting peripheral cables and power cords to the server.
Содержание ProLiant DL320 Generation 5
Страница 1: ...HP ProLiant DL320 Generation 5 Server User Guide September 2006 First Edition Part Number 419196 001 ...
Страница 15: ...Component identification 15 Fan assembly location ...
Страница 39: ...Hardware options installation 39 11 Install the diskette drive into the media cage 12 Install the media cage ...
Страница 52: ...Cabling 52 Slot 1 Video connector option cable routing ...
Страница 53: ...Cabling 53 Battery backed write cache cable routing ...
Страница 71: ...Troubleshooting 71 ...
Страница 94: ...Technical support 94 ...
Страница 95: ...Technical support 95 ...