Operations 13
a.
Select the
Enclosure Information
tab, and then select the
Overall
checkbox in the Device Bays item.
b.
Initiate a shutdown from the Virtual Power menu:
—
Select
Momentary Press
to initiate a controlled shutdown of applications and the OS.
—
Select
Press and Hold
to initiate an emergency shutdown of applications and the OS.
IMPORTANT:
When the server blade is in standby mode, auxiliary power is still being provided.
To remove all power from the server blade, remove the server blade from the enclosure.
After initiating a virtual power down command, be sure that the server blade is in standby mode by
observing that the system power LED is amber.
Remove the server blade
CAUTION:
Do not use the server blade release lever to lift or carry the server blade. Always
support the weight of the server blade by handling the chassis directly. Improper use can damage
the release lever and the server blade.
To remove the component:
1.
Identify the proper server blade.
2.
Power down the server blade (on page
12
).
3.
Remove the server blade.
4.
Place the server blade on a flat, level work surface.
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION:
To prevent damage to electrical components, properly ground the server blade
before beginning any installation procedure. Improper grounding can cause ESD.
Содержание ProLiant BL460c G6
Страница 19: ...Setup 19 2 Remove the enclosure connector cover 3 Prepare the server blade for installation ...
Страница 20: ...Setup 20 4 Install the server blade ...
Страница 99: ...Technical support 99 ...
Страница 100: ...Technical support 100 ...
Страница 103: ...Acronyms and abbreviations 103 VCA Version Control Agent VCRM Version Control Repository Manager ...