Periodic maintenance 67
Component to be inspected
Task
Frequency
Capable Party
Suppression system
Suppression system test
As required by
local code
Authorized technician
—
Fire-pull visual and operational
inspection
As required by
local code
Authorized technician
—
Fire strobe and horn visual and
operational inspection
As required by
local code
Authorized technician
HP POD 40c NA structure
Component to be inspected
Task
Frequency
Capable Party
Complete structure
Visually inspect the structural
integrity.
Annually
Qualified personnel
—
Inspect the door operation and
inspect the door gaskets for water
and air leaks.
Annually
Qualified personnel
—
Visually inspect the paint. Perform
prep and touch-up as necessary.
Annually
Qualified personnel
Life safety
Component to be inspected
Task
Frequency
Capable Party
Manual EPO shunt trip
EPO FUNCTIONAL TEST (POD will
power down)
Manually initiate EPO with the
internal and external push buttons
(if installed) in succession. (Verify
all shunt-trips on all panels trip.)
Annually
Qualified personnel
Thermal EPO shunt trip
EPO FUNCTIONAL TEST (POD will
power down)
Initiate a thermal (automatic) EPO
shutdown via the EPO
temperature switches located in
the hot aisle. (Verify all shunt-trips
on all panels trip.)
Annually
Qualified personnel