Standard Operation Procedure
Document No. : NAIROBI FA DIS ASS’Y SOP
Station
:
Name
: Ver. :
Date
:
Step
:
:
:
:
Loosen Screws
22(1/1)
0.1
2012/10/30
1. Disassemble the 4 cables from routing rib.
(Fig.1)
2. Loosen screw * 2. (Fig.2/Fig.3)
1
2
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
:
Issue department
:
Alicia Chien
NPSU-SE
Fig.2
Fig.3
Electric cross screwdriver (1#)
1