Installing the Tower Server
HP ProLiant ML530 Generation 2 Server Setup and Installation Guide
6-5
HP CONFIDENTIAL
Writer: Richard O. Heath File Name: g-ch6 Installing the Tower Server.doc
Codename: Seattle Slew Part Number: 225579-002 Last Saved On: 1/8/03 3:18 PM
CAUTION:
Hot-plug power supplies for the ProLiant ML530 Generation 2 server are
keyed to ensure that only 600-W hot-plug power supplies can be installed in the
server. The handles on 600-W power supplies are carbon (black) to distinguish them
from 450-W power supplies, which are opal (white).
Power Cord Guidelines
Connect the power cords provided with your server or hot-plug power supply option
into each AC power supply and use the power cord tie-wraps to secure the AC power
cords. Leave a service loop for the plug to prevent the plug from accidentally being
disengaged.
See Chapter 5, “Installing the Rack Server,” for additional instructions.
Powering Up the Server
Power up the server after the peripheral and power cords are connected to the server.
WARNING: To reduce the risk of electrical shock or damage to the equipment:
•
Do not disable the power cord grounding plug. The grounding plug is an
important safety feature.
•
Plug the power cord into a grounded (earthed) electrical outlet that is easily
accessible at all times.
•
Unplug the power cord from each power supply to disconnect power to the
equipment.
•
Do not route the power cord where it can be walked on or pinched by items
placed against it. Pay particular attention to the plug, electrical outlet, and
the point where the cord exits from the server.