Installing the Series 4100gl Switches
Installation Procedures
4. Verify the Switch Passes Self Test
After you have installed any modules and the optional second power supply,
but before mounting the switch in its network location, you should first verify
that it is working properly by plugging it into a power source and verifying
that it passes its self test.
If you have installed a second power supply, repeat these procedures with the
second power supply to verify that it works correctly also.
1. Connect the power cord supplied with the switch to the power connector
on the back of the switch, and then into a properly grounded electrical
outlet.
Connect power cord to
power connector
Sw
itc
hes
Installing the Series 4100gl
N o t e
The Series 4100gl Switches do not have a power switch. They are powered on
when the power cord is connected to the switch and to a power source.
If your installation requires a different power cord than the one supplied with
the switch, please see the Installation Precautions on
2. Check the LEDs on the switch and on each of the switch modules. The
LED behavior is described on the next page.
If the LED display is different than what is described, especially if the
Fault LED stays on for more than approximately 120 seconds or it starts
flashing, the self test has not completed correctly. Refer to chapter 4,
“Troubleshooting” for diagnostic help.
2-11
Содержание J4861A
Страница 1: ...installation and getting started guide www hp com go hpprocurve hp procurve series 4100gl switches ...
Страница 2: ......
Страница 3: ...HP ProCurve Series 4100gl Switches Installation and Getting Started Guide ...
Страница 20: ... This page is intentionally unused ...
Страница 64: ... This page is intentionally unused ...
Страница 68: ... This page is intentionally unused ...
Страница 76: ... This page is intentionally unused ...
Страница 93: ......