![HP Integrity rx5670 Скачать руководство пользователя страница 31](http://html.mh-extra.com/html/hp/integrity-rx5670/integrity-rx5670_site-preparation-manual_164480031.webp)
General Site Preparation Guidelines
Conversion Factors and Formulas
Chapter 2
31
Conversion Factors and Formulas
The conversion factors provided in this section are intended to ease data calculation for systems that do not
conform specifically to the configurations listed in this Site Preparation Guide. Listed below are the
conversion factors used in this document, as well as additional conversion factors which may be helpful in
determining those factors required for site planning.
Conversion Factors
•
Refrigeration
— 1 watt = .86 kcal/h
— 1 watt = 3.412 Btu/h
— 1 watt = 2.843 x 10
-4
tons
— 1 ton = 200 Btu/min.
— 1 ton = 12,000 Btu/h
— 1 ton = 3,517.2W
•
Metric Equivalents
— 1 centimeter = 0.3937 in.
— 1 meter = 3.28 ft.
— 1 meter = 1.09 yds
— 1 in. = 2.54 cm
— 1 ft. = 0.305m
— 1 CFM = 1.7m3/h
•
kVA Conversions
Three phase
kVA = V
×
A
×
√
3
⁄
1000
•
Single phase
kVA = V
×
A
⁄
1000
Formulas
•
kVA = Voltage x Current (amps)
•
Watts = VA x PF
•
BTU = Watts x 3.41
Содержание Integrity rx5670
Страница 4: ...Contents 4 Power Cable 43 Glossary 45 ...
Страница 10: ...System Specifications Environmental Specifications Chapter 1 10 ...
Страница 30: ...General Site Preparation Guidelines Space Requirements Chapter 2 30 Equipment cable routing ...
Страница 42: ...Power Plug Configuration Male End of Power Cable Chapter 3 42 Figure 3 10 GB 1002 Plug ...
Страница 44: ...Power Plug Configuration Power Cable Chapter 3 44 ...