3.
Install the server blade.
The server blade should come up to standby power. The server blade is at standby power if the
blade power LED is amber.
Server blade power states
The server blade has three power states: standby power, full power, and off. Install the server
blade into the enclosure to achieve the standby power state. Server blades are set to power on to
standby power when installed in a server blade enclosure. Verify the power state by viewing the
LEDs on the front panel, and using
Table 1
.
Table 1 Power States
DC Power Applied?
Standby Power
Applied?
Front Panel Power
Button Activated?
Server Blade Installed
in Enclosure?
Power States
No
Yes
No
Yes
Standby power
Yes
Yes
Yes
Yes
Full power
No
No
No
No
Off
Installing and powering on the server blade
11