Powering up the server
Procedure
1. Remove the bezel.
2. Use one of the following methods to power up the server:
• Press the Power On/Standby button.
• Use the virtual power button through iLO.
Installing the bezel
Procedure
1. Install the bezel.
a. Attach the bezel to the latch ear.
b. Press the latch.
c. Close the bezel.
Removal and replacement procedures
40
Содержание HPE ProLiant DL325
Страница 24: ...Customer self repair 24 ...
Страница 25: ...Customer self repair 25 ...
Страница 26: ...Customer self repair 26 ...
Страница 61: ... SFF a Remove the optical drive cage b Remove the blank Removal and replacement procedures 61 ...
Страница 63: ... SFF a Remove the optical drive cage b Remove the optical drive Removal and replacement procedures 63 ...
Страница 68: ...10 Remove the iLO service port assembly 11 Remove the front I O module Removal and replacement procedures 68 ...
Страница 135: ... 4LFF drive connected to type a controller 4LFF drive connected to type p controller Slot 1 Cabling 135 ...
Страница 136: ... Slot 2 Slot 3 Cabling 136 ...
Страница 139: ... Slot 2 Slot 3 Cabling 139 ...
Страница 145: ... SFF Cable routing Power supply Non hot plug power supply Cabling 145 ...
Страница 148: ...Item Description Orange Front I O cable Blue Ambient temperature sensor cable Cable routing USB 3 0 LFF SFF Cabling 148 ...
Страница 149: ...Cable routing Serial port Cabling 149 ...
Страница 150: ...Cable routing Chassis Intrusion Detection switch Cable routing M 2 SSD Slot 1 Slot 2 Cabling 150 ...
Страница 152: ... Slot 2 Slot 3 Cabling 152 ...
Страница 153: ...Cable routing Energy pack Cabling 153 ...