Preparation procedures
To access some components and perform certain service procedures, you must perform one or more of the following
procedures:
•
•
•
•
•
•
•
Extend the chassis from the rack
•
Remove the chassis from the rack
•
•
Install the chassis into the rack
•
•
Power down the server
Before powering down the server for any upgrade or maintenance procedures, perform a backup of critical server data
and programs.
IMPORTANT: When the server is in standby mode, auxiliary power is still being provided to the system.
To power down the server, use one of the following methods:
• Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters standby mode.
• Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter standby mode.
This method forces the server to enter standby mode without properly exiting applications and the OS. If an
application stops responding, you can use this method to force a shutdown.
• Use a virtual power button selection through iLO 5.
This method initiates a controlled remote shutdown of applications and the OS before the server enters standby
mode.
Before proceeding, verify that the server is in standby mode by observing that the system power LED is amber.
Remove the hot-plug drive
The SATA, SAS, and NVMe drives use the same HPE Smart Carrier (SC).
CAUTION: To prevent improper cooling and thermal damage, do not operate the system unless all bays are
populated with either a component or a blank.
Removal and replacement procedures
24
Содержание HPE Apollo 2000 Gen10 Plus
Страница 17: ...Customer self repair 17 ...
Страница 18: ...Customer self repair 18 ...
Страница 19: ...Customer self repair 19 ...
Страница 70: ...To replace the component reverse the removal procedure Removal and replacement procedures 70 ...
Страница 94: ...RCM sideband cabling Cabling 94 ...