Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No.
: Slice ODD FA Disassembly SOP
Station
:
Operation name
: Ver. :
Date
:
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step
:
Issue Dept.
:
Auditor
Stanley Chen
NPSU-PPE
FFC CNTR
1. Disassembly ODD FFC from ODD/B (Fig.1)
2. Disassembly ODD toward downside (Fig.1)
Disassembly ODD
3(1/1)
0.10
2016/6/29
Fig.1
Toward down side
Содержание Elite Slice
Страница 3: ...MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL Slice auditor Stanley Chen ...
Страница 18: ...MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL Slice Auditor Stanley Chen ...
Страница 24: ...MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL Slice Auditor Stanley Chen ...