SOP
Document No. : Empire FA Dis-assembly SOP
Station :
Operation Des : Ver. :
Date
:
Fixture list
Qty
Fixture list
Qty
Step
:
Attention
︰
Pls inform the OP assistant immediately once there is any abnormal
Editor
:
Publish
:
Zhu Ya
IE
1. Take out the USB/B screw M2 x 3L (
6052B0185401
) * 3 (Picture 1/2)
。
Twisting force value
:
1.5
±
0.1Kgf
.
Cm
Make sure the screw can’t loose
,
can’t be dropped into the units
Order:1
→2→3
2.Take out the USB/B
,
disassemble the USB/B and FPC CNTR
,
recycle the USB/B
Take out the USB/B from the under cut direction
When disassemble the USB CNTR
,
FPC and CNTR should have about 10
°
angle
16(1/1)
Disassemble USB/B
Picture 1
3
1
2
WWAN
NON-WWAN
Picture2
1
2
3
2019/8/20
1.00