2-34
Installing the Switch
Sample Network Topologies for PoE+ Switches
Stacking the Switch
The E2620 and E2620-PoE+ Switches can be connected together, through
standard network connections, and managed through a single IP address. Up
to 16 switches can be connected together in such a “virtual stack”.
You identify an E2620 or E2620-PoE+ Switch as the “Commander” and give
that switch an IP address. Up to 15 other switches in the network can then
easily be configured as Members of the stack and managed through the
Commander’s IP address. The management includes Telnet access and web
browser interface access to the Commander and to each Member switch
through the Commander.
For more information on stacking your switch, see the
Management and
Configuration Guide,
which is on the HP Web site at
(see
).
Содержание E2620
Страница 1: ...Power over Ethernet HP E2620 Switches Installation and Getting Started Guide ...
Страница 2: ......
Страница 3: ...HP E2620 Switches Installation and Getting Started Guide ...
Страница 9: ...vii D Recycle Statements Waste Electrical and Electronic Equipment WEEE Statements D 1 Index ...
Страница 10: ...viii ...
Страница 35: ...2 11 Installing the Switch Installation Procedures Figure 2 6 Mounting in a rack Install 12 24 screws ...
Страница 78: ......
Страница 98: ...C 8 Safety and EMC Regulatory Statements Safety Information China Safety Information China ...
Страница 100: ...C 10 Safety and EMC Regulatory Statements EMC Regulatory Statements Korea Taiwan ...
Страница 104: ...C 14 Safety and EMC Regulatory Statements EMC Regulatory Statements ...
Страница 114: ...6 Index ...
Страница 115: ......