Server Installation
3.
Close the cable clamp (1) and tighten the clamp thumbscrews to hold the cable
clamp in place (2).
Figure 4-12: Closing the cable clamp on routed cables
4.
Route the cables to the side of the rack. Refer to Figure 4-13 for an example.
Figure 4-13: Multiple servers installed in a rack with
properly routed cabling
4-14
HP ProLiant DL320 Generation 2 Server Setup and Installation Guide
HP CONFIDENTIAL
Writer: Anna Roberts File Name: e-ch4 Server Installation.doc
Codename: MoonStar Part Number: 293166-002 Last Saved On: 1/31/03 11:17 AM