Planning the installation
Safety and regulatory compliance
For important safety, environmental, and regulatory information, see
Safety and Compliance Information for
Server, Storage, Power, Networking, and Rack Products
, available at the Hewlett Packard Enterprise website
(
http://www.hpe.com/support/Safety-Compliance-EnterpriseProducts
).
Product QuickSpecs
For more information about product features, specifications, options, configurations, and compatibility, see the
product QuickSpecs on the
Hewlett Packard Enterprise website
Determine power and cooling configurations
Validate power and cooling requirements based on location and installed components.
Power requirements
Installation of this equipment must comply with local and regional electrical regulations governing the
installation of IT equipment by licensed electricians. This equipment is designed to operate in installations
covered by NFPA 70, 1999 Edition (National Electric Code) and NFPA-75, 1992 (code for Protection of
Electronic Computer/Data Processing Equipment). For electrical power ratings on options, refer to the user
documentation supplied with that option.
WARNING:
To reduce the risk of personal injury, fire, or damage to the equipment, do not overload the AC supply
branch circuit that provides power to the rack. Consult the electrical authority having jurisdiction over
wiring and installation requirements of your facility.
CAUTION:
Protect the server from power fluctuations and temporary interruptions with a regulating UPS. This
device protects the hardware from damage caused by power surges and voltage spikes and keeps the
server in operation during a power failure.
HPE Apollo Platform Manager
HPE Apollo Platform Manager, formerly named HPE Advanced Power Manager, is a point of contact for
system administration.
To install, configure, and access HPE APM, see the
HPE Apollo Platform Manager User Guide
on the Hewlett
Packard Enterprise website (
http://www.hpe.com/support/APM_UG_en
Hot-plug power supply calculations
For more information on the hot-plug power supply and calculators to determine server power consumption in
various system configurations, see the
Hewlett Packard Enterprise Power Advisor website
Planning the installation
9
Содержание Apollo 2000 System
Страница 50: ... 1U left rear I O blank 2U rear I O blank 50 Operations ...
Страница 123: ... AMD FirePro S9150 GPU NVIDIA Quadro K4200 GPU or NVIDIA Quadro M4000 GPU Hardware options installation 123 ...
Страница 130: ... AMD FirePro S9150 GPU 11 Install Accelerator 1 into slot 3 AMD FirePro S7150 GPU 130 Hardware options installation ...
Страница 134: ...AMD FirePro S9150 19 Install Accelerator 2 into slot 4 AMD FirePro S7150 GPU 134 Hardware options installation ...