NOTE:
A short IVP script is provided for a simple verification of device setup. To run the
short script, select the appropriate file,
.Ivp_short.scp or ivp_short.vms
from the GUI IVP
menu. This script will run for 15 minutes and then terminate with a summary log. The short
script may be run as a preliminary to but not in place of the long IVP script, which is the full
IVP test.
The long IVP will run a "cycle of testing", i.e. until the slowest device has completed one
pass of all tests (typically 4 or 5 hours).
Optionally, you can increase the IVP long run time by increasing the
cyclecount
(3 passes
are recommended). Two of the ways to do this are described. If you wish to know more
about Q-Vet features like this, see the training course at
http://learning1.americas.cpqcorp.net/wbt/cs127a-ewb/welcome.htm.
•
After executing (loading) the IVP long script, issue the Q-Vet command
set
cyclecount
x, where x is the number of cycles desired.
•
If you have the GUI, simply of to the menu item Options >Cyclecount and change
the setting.
Verify with Q-Vet 5-7
Содержание AlphaServer ES47
Страница 4: ......
Страница 8: ...viii ...
Страница 16: ...1 6 hp AlphaServer ES47 ES80 GS1280 I O Drawer Upgrade ...
Страница 24: ...2 8 hp AlphaServer ES47 ES80 GS1280 I O Drawer Upgrade ...
Страница 66: ...4 10 hp AlphaServer ES47 ES80 GS1280 I O Drawer Upgrade ...
Страница 76: ...5 10 hp AlphaServer ES47 ES80 GS1280 I O Drawer Upgrade ...