
42
Installing the Library
2.
Identify the proper slot in the card cage for the e2400-FC 2G interface controller. One must be
installed in the base module card cage, and up to three can be installed in the card cage expansion
module (see
).
Figure 29
Interface controller locations
TIP:
A step stool can be helpful to reach the interface controller slot in the base module card cage
located near the top of the library rack.
3.
Using a #1 Phillips screwdriver, remove and discard a slot cover for each interface controller needed
for installation.
4.
With the ports labeled TD# (where # denotes port numbers 0 though 3) to your left as you face the
back of the library, slide the controller into the card cage slot. Move the ejector handles inward to
fully seat the card.
5.
Using a #1 Phillips screwdriver, tighten the ejector handle screws.
NOTE:
Cabling is performed in the next section, ”
1
Interface controller cards
10461
1
Содержание AD560-96002
Страница 16: ...16 Library overview Figure 3 Example of a fully expanded Enterprise Modular Library E Series 10449 3 ...
Страница 46: ...46 Installing the Library ...
Страница 52: ...52 Preparation for use ...
Страница 96: ...96 Maintenance ...
Страница 100: ...100 Moving the library ...
Страница 128: ...128 Installing a redundant PDU ...