HP AB292A Скачать руководство пользователя страница 3

Chapter 1

3

1

HP Server Mount Kit for 19 in. 2-Post Rack 
Installation Instructions

Introduction

This manual provides instructions for installation of the hp Integrity cx2600 server chassis in a 19 in. 
2-column rack, with column widths of 3 to 9 inches.

Cabinet Safety Precautions

WARNING

Ensure that the rack is level and stable before working on the rack. Be sure the 
leveling jacks (feet) extend to the floor and that the full weight of the rack rests 
firmly on the floor.

WARNING

Ensure that the rack has anti-tip measures in place. Such measures may include 
floor-bolting, anti-tip feet, ballast, or a combination of these measures as specified by 
the rack manufacturer and applicable codes.

WARNING

Be sure that adequate personnel are on hand to support the product(s) during the 
installation process. Use of the appropriate lifting device is recommended as an 
installation aid.

WARNING

Always load the rack from the bottom up. Load the heaviest items in the rack first. 
This makes the rack bottom-heavy and helps prevent the rack from becoming 
unstable.

WARNING

Do not overload the branch circuit that provides power to the rack. The total rack 
load should not exceed 80% of the branch circuit rating.

Mounting Kit Contents

This manual provides installation instructions for server mount kit AB292A. This kit is intended for use with 
the hp Integrity cx2600 server, and includes the following:

Chassis  Tray  (Base)

Two  Rack  Brackets

Cable Management Strain Relief Bar

Mounting Hardware (screws, washers, and nuts)

Содержание AB292A

Страница 1: ...HP Server Mount Kit AB292A for 19 in 2 Post Rack Installation Instructions Manufacturing Part Number AB292 96001 April 2004 U S A Copyright 2004 Hewlett Packard Development Company L P ...

Страница 2: ... technical or editorial errors or omissions contained herein Reproduction adaptation or translation of this document without prior written permission is prohibited except as allowed under the copyright laws Printed in the U S A Related Documents The latest versions of server documents and any updates to these documents are posted under the appropriate server at http docs hp com For online access t...

Страница 3: ... rack manufacturer and applicable codes WARNING Be sure that adequate personnel are on hand to support the product s during the installation process Use of the appropriate lifting device is recommended as an installation aid WARNING Always load the rack from the bottom up Load the heaviest items in the rack first This makes the rack bottom heavy and helps prevent the rack from becoming unstable WA...

Страница 4: ...adequate support to prevent unbalancing the rack or stressing the columns The center mount option provides improved weight distribution for those installations where columns are already stressed Figure 1 1 Mounting Options The mounting holes in the chassis rack ears together with the holes in the tray base and rack columns approximately 1 4 inch centers allow adjustment of the server mounting posi...

Страница 5: ...e installation procedure and determine which screws will be required Alternate screws are provided due to the variations in rack column mounting threads Verify that all needed parts are available A mounting kit parts list is provided at the rear of this manual Installation Procedure Front Mount Front mount a server in a 2 column rack as follows Step 1 Install the tray base to the back of the rack ...

Страница 6: ...the columns with T25 10 32 or 12 24 panhead screws lockwashers and 12 flatwashers Figure 1 4Attach Server Rack Ears to Rack Columns Front Mount Step 4 Loosely attach the chassis brackets to each side of the server chassis with T15 screws and plated flatwashers Attach the rack brackets to the tray base with T25 10 32 screws Then tighten all screws Step 5 Attach the cable management strain relief ba...

Страница 7: ...nstallation procedure and determine which screws will be required Alternate screws are provided due to the variations in rack column mounting threads Verify that all needed parts are available A mounting kit parts list is provided at the rear of this manual Installation Procedure Center Mount Center mount a server in a 2 column rack as follows Step 1 Install the tray base to the front of the rack ...

Страница 8: ...led Step 3 From the front of the rack slide the server chassis onto the tray base with the chassis rack ears against the front of the tray Attach the rack ears to the tray with T25 10 32 screws lockwashers and 12 flatwashers Figure 1 7Attach Server Rack Ears to Server Tray Center Mount 2pcnthrd Tray View from Rear Bracket T25 10 32 or 12 24 Screws Nut Clips T25 10 32 or 12 24 Screws Cable Manageme...

Страница 9: ...Loosely attach the chassis brackets to each side of the server chassis with T15 screws and plated washers Attach the rack brackets to the rack columns with T25 10 32 or 12 24 panhead screws lockwashers and 12 flatwashers Then tighten all screws Step 5 Attach the cable management strain relief bar to the brackets with T25 10 32 screws See Figure 1 6 ...

Страница 10: ...B292 00001 Bracket rack 2 column 2 AB292 00002 MFAB cable management strain relief bar 1 AB292 00011 Screw T15 waferscrew w captive lock washer M4 x 7 mm 7 5 mm 8 A6474 00134 Screw T25 10 32 0 625 L panhead w CC washer 16 2680 0323 Screw slot Phillips 12 24 x 0 6 L panhead 8 2940 0503 Washer flat 4 3 mm ID 12 mm OD 1 mm thick 8 3050 1244 Washer lock HLCL 12 0 225 ID 0 377 OD SS w passivated finish...

Отзывы: