Operations 12
Operations
Power down the server
Before powering down the server for any upgrade or maintenance procedures, perform a backup of
critical server data and programs.
IMPORTANT:
When the server is in standby mode, auxiliary power is still being provided to
the system.
To power down the server, use one of the following methods:
•
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters
standby mode.
•
Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter
standby mode.
This method forces the server to enter standby mode without properly exiting applications and the
OS. If an application stops responding, you can use this method to force a shutdown.
•
Use a virtual power button selection through iLO.
This method initiates a controlled remote shutdown of applications and the OS before the server
enters standby mode.
Before proceeding, verify the server is in standby mode by observing that the system power LED is
amber.
Power up the server
To power up the server, press the Power On/Standby button.
Remove the server from the chassis
CAUTION:
Before removing the server, verify that the backup LED is not flashing.
1.
Power down the server (on page
CAUTION:
To avoid damage to the server, always support the bottom of the server when
removing it from the chassis.
Содержание 828689-002
Страница 37: ...Cabling 37 Front panel LED board assembly cabling ...
Страница 64: ...Support and other resources 64 ...
Страница 65: ...Support and other resources 65 ...