© 2021 Hoymiles Power Electronics Inc. All rights reserved.
13
Single-phase Microinverter User Manual
Step 6. Energize the System
A) Turn on the AC breaker of the branch circuit.
B) Turn on the main AC breaker of the house. Your system will start to generate power after about two
minutes of waiting time.
Step 7. Set Up the Monitoring System
Refer to the DTU User Manual or DTU Quick Installation Guide, and Quick Installation Guide for S-Miles Cloud
(Hoymiles Monitoring Platform) Online Registration to install the DTU and set up the monitoring system.
Product information is subject to change without notice. (Download reference manuals at www.hoymiles.
com.)