Hoymiles DTU-G100 Скачать руководство пользователя страница 8

 

                                                  © 2019 Hoymiles Converter Technology Co., Ltd. All rights reserved.

                                                         

8

 

 

 

DTU-G100 3 Gen 

(5) Start Procedure 

Once the DTU is powered on, the red, green and blue lights will flash for one second in turns, then 
the  blue  light  will  turn  on  for  40  seconds  for  DTU  self-checking.  After  this,  the  green  light  will  be 
flashing until Networking completed.   

Note

 

(1) Non-professionals do not modify other parameters. 
(2) The “Reset” button on the DTU shell is only for customers who use the enterprise WiFi. 

 

4. Site creation on HMP 

 

A. Install  Hoymiles  Installer  APP  by  searching  “Hoymiles”  at  the  App  Store  (IOS)  or  Play  Store 
(Android). 
B. Open  the  APP  and  login  in  with  your  installer  account  name  and  password.  If  you  are  a  new 
installer with Hoymiles, please apply an Installer account from your distributor in advance. 
C. Add Station, select the “Station” tab on the bottom, then select “

” on the right top side of the 

page. 
D. Select “Quick” for Single-DTU and “Profession” for Multi-DTU. 
E. Please fill in the station details accordingly, and press “Next” after completed. 
F. Press  “Add  DTU  ID”,  scan  the  DTU  ID  (or  you  can  manually  input  ID)  and  press  “Next”  after 
complete.   
G. Click “Start binding” and choose the angle and tilt base on the installation. 
H. Scan the Microinverter ID (or you can manually input the ID) and click the tick after completing 
each ID input. Press “Finish” once all Microinverter ID has been input. 
I. Disable the Scan function on the top of the right-hand side and design the Layout base on the 
installation.  Click  the  tick  box  on  the  top  of  the  right-hand  side,  and  then  select  “Next”  after 
completing the design. 
J. Upload a picture of the site and select “Finish” to complete the site creation. 
K. The new site will appear on the Station list from the Installer account. 
L. Please click the “Networking” button after the power station is created. 
M. Please wait about 30 minutes, the station will show online, and all the MI-IDs are found. 

 

5. Customer Login   

 

A. Please download the End User App. You can search “Hoymiles” at the App Store (IOS) or Play 
Store (Android).   
B. Log in with the Password and Username that has been set up by Installer on the previous step 
(Section 6 step e), and press “Login”. 
C. Customers will able to view all details once the data start to upload, normally it will need around 
30 minutes for the first data coming through. 
D. Customers can also view the Microinverter generating details via accessing the HMP monitoring 
platform website at 

https://world.hoymiles.com

Содержание DTU-G100

Страница 1: ...Version 2 1 August 2020...

Страница 2: ...The DTU 4 2 3 The Hoymiles Monitoring Server 4 3 DTU Installation 5 3 1 System Capacity 5 3 2 Basic Conditions Required 5 3 3 Dimensions 5 3 4 Interface Layout 5 3 5 Local Install Assistant 6 3 6 Sys...

Страница 3: ...ng so may cause death or injury to persons or damage to equipment 1 3 User This manual is only for professional installation and maintenance personnel to use 1 4 Support and Contact Information If you...

Страница 4: ...microinverters rank into the first class of the world s Microinverter industry 2 2 The DTU The DTU is the key component in Hoymiles microinverter system It works as the communication gateway which op...

Страница 5: ...TU can monitor may be reduced 3 2 Basic Conditions Required Before installing the DTU ensure the site meets the following requirements l The straight distance between DTU and Microinverter shall be le...

Страница 6: ...glance of eyes B Add the Connection status which will display the signal strength between each MI with connected DTU so that installer can adjust the DTU installation location accordingly This functio...

Страница 7: ...te reduction increases with the amount of reinforcement 10 90 Metal Up to 100 Therefore the DTU shall be placed as close to the microinverters as possible at the site to ensure good communication betw...

Страница 8: ...te G Click Start binding and choose the angle and tilt base on the installation H Scan the Microinverter ID or you can manually input the ID and click the tick after completing each ID input Press Fin...

Страница 9: ...system is energized and the DTU detects the microinverters you need to complete the installation map A Peel the serial number label from the DTU and place it on the installation map B Complete system...

Страница 10: ...from there 9 LED indicator working status description Red Light Description Flashes every 1 second No SIM Card Flashes every 0 5 seconds DTU disconnect with server Blue Light Description Flashes ever...

Страница 11: ...Direct power supply Display LED indicator light Others Standard EN60950 EN61000 3 2 EN61000 3 3 FCC 15B 15C Indicator Status Description Solution Red LED Flesh in Red every 1 second No SIM Card l Che...

Отзывы: