![Howe R-407A Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/howe/r-407a/r-407a_quick-step-manual_2171307002.webp)
Howe Corporation-Service Department 773-235-0200 [email protected]
2
QUALITY REFRIGERATION EQUIPMENT SINCE 1912
that circuit first, 1/8 – ¼ turn at a time, until it looks like the other circuit. Open both TXV’s 1/8 – ¼
turn at a time,
equally and simultaneously
, until evidence of underfeeding evaporator is gone.
It
will be necessary to wait 10 -15 minutes between adjustments to ensure that TXV’s are
balanced properly
. For more details, please refer to Howe’s service and installation manual.
_______________________________________________________________________________
HEAT EXCHANGER INSTALLATION
Howe Corporation will ship a “loose” suction line heat exchanger with the purchase of your ice flaker.
Installation of this heat exchanger is required.
The heat exchanger should be installed within 4
feet of the flaker per Howe guidelines. Please see Howe installation and service manual for
suggested piping diagram.
_______________________________________________________________________________________
230/1/60 Panel
460/3/60 Panel
Hi-Amperage Overload Adjustment
The proper adjustment of Howe’s hi-amperage overload device will ensure proper protection for the ice flaker.
To set the overload device correctly, mark the location of the set screw before any adjustment is made. Using
a small flathead screwdriver, gently and slowly turn counter-clockwise (left) until overcurrent LED on the control
board illuminates. Turn screw clockwise (right) one (1) hash mark and stop. Press the reset button to start the
machine again.
The 460V panel has two overload devices. The left device is for the drive motor and the right device is for the
water pump. Both should be adjusted according to the full load amperage rating on their respective motors.
Notice that the range scale is different for each overload device.