Blower Drive Arrangement Options. 

The driver must 

also be mounted on an adjustable base to permit 

installing, adjusting and removing the V-belts. To 

position the driver correctly, both sheaves need to be 

mounted on their shafts and the nominal shaft center 

distance known for the belt lengths to be used.  

CAUTION:

 

Drive couplings and sheaves (pulleys) 

should have an interference fit to the shaft of the blower 

(set screw types of attachment generally do not provide 

reliable service.) It is recommended that the drive 

coupling or sheave used have a taperlock style bushing 

which is properly sized to provide the correct 

interference fit required. Drive couplings, that require 

heating to fit on the blower shaft, should be installed per 

coupling manufacturer recommendations. A drive 

coupling or sheave should not be forced on to the shaft 

of the blower as this could affect internal clearances 

resulting in damage to the blower. 

Engine drive applications often require special 

consideration to drive coupling selection to avoid 

harmful torsional vibrations. These vibrations may 

lead to blower damage if not dampened adequately. 

It is often necessary to install a fly-wheel and/or a 

torsionally soft elastic element coupling based on 

the engine manufacturer recommendations. 

The driver sheave should also be mounted as close to 

its bearing as possible, and again should fit the shaft 

correctly. Position the driver on its adjustable base so 

that 2/3 of the total movement is available in the 

direction away from the unit, and mount the assembly so 

that the face of the sheave is accurately in line with 

the unit sheave. This position minimizes belt wear, and 

allows sufficient adjustment for both installing and 

tightening the belts. After belts are installed, adjust their 

tension in accordance with the manufacturer’s 

instructions. However, only enough tension should be 

applied to prevent slippage when the unit is operating 

under load. Excessive tightening can lead to early 

bearing concerns or shaft breakage. 
Before operating the drive under power to check initial 

belt tension, first remove covers from the unit 

connections. Make sure the interior is still clean, and 

then rotate the shaft by hand. Place a coarse screen 

over the inlet connection to prevent anything being 

drawn into the unit while it is operating, and avoid 

standing in line with the discharge opening. Put oil in the 

sumps per instructions under 

LUBRICATION

Piping 

Before connecting piping, remove any remaining anti-

rust compound from unit connections. Clean pipe should 

be no smaller than unit connections. In addition, make 

sure it is free of scale, cuttings, weld beads, or foreign 

material of any kind. To further guard against damage to 

the unit, especially when an inlet filter is not used, install 

a substantial screen of 16 mesh backed with hardware 

cloth at or near the inlet connections. Make provisions to 

clean this screen of collected debris after a few hours of 

operation. It should be removed when its usefulness has 

ended, as the wire will eventually deteriorate and small 

pieces going into the unit may cause serious damage.

 

  

ISRB_2002 GEA 19171 Roots URAI.indd   6

17/09/2015   12:52

Содержание Roots Metric Series

Страница 1: ...n com Roots Universal RAI URAI DSL URAI G Metric Series Installation Operation Maintenance Manual www howden com Installation Operation and Maintenance Manual Roots Universal RAI URAI DSL URAI G Metri...

Страница 2: ...d operation See SAFETY PRECAUTIONS Install all equipment correctly Foundation design must be adequate and piping carefully done Use recommended accessories for operating protection Make sure both driv...

Страница 3: ...connections or taps for instruments thermometers and pressure or vacuum gauges at or near the inlet and discharge connections of the unit These along with a tachometer will enable periodic checks of o...

Страница 4: ...sults Handling of the equipment needs to be accomplished with care and in compliance with safe practices Unit mounting must be solid without strain or twist and air piping must be clean accurately ali...

Страница 5: ...nit is DIRECT COUPLED to its driver the driver RPM must be selected or governed so as not to exceed the maximum speed rating of the unit Refer to Table 1 for allowable speeds of various unit sizes A f...

Страница 6: ...base so that 2 3 of the total movement is available in the direction away from the unit and mount the assembly so that the face of the sheave is accurately in line with the unit sheave This position...

Страница 7: ...though WHISPAIR units operate at generally lower noise levels than conventional rotary blowers Specific recommendations on silencing can be obtained from your local Howden Roots distributor Discharge...

Страница 8: ...dip into the main oil sumps causing oil to splash directly on gears and into bearings and seals A drain port is provided below each bearing to prevent an excessive amount of oil in the bearings Seals...

Страница 9: ...ed by half or 3000 hours oil service life Normal life expectancy of petroleum based oils is about 2000 hours with an oil temperature of about 180 F 82 C As the oil temperature increases by increments...

Страница 10: ...is restarted gradually close the discharge unloading valve to apply working pressure At this point it is recommended that a pressure gauge or manometer be connected into the discharge line if not alr...

Страница 11: ...ISRB_2002 GEA 19171 Roots URAI Page 11 of 32...

Страница 12: ...idered expendable items to be replaced whenever drainage from the headplate vent cavity becomes excessive or when the blower is disassembled for any reason Some oil seal leakage may occur since an oil...

Страница 13: ...ISRB_2002 GEA 19171 Roots URAI Page 13 of 32...

Страница 14: ...ISRB_2002 GEA 19171 Roots URAI Page 14 of 32...

Страница 15: ...ISRB_2002 GEA 19171 Roots URAI Page 15 of 32...

Страница 16: ...ISRB_2002 GEA 19171 Roots URAI Page 16 of 32...

Страница 17: ...ISRB_2002 GEA 19171 Roots URAI Page 17 of 32...

Страница 18: ...ISRB_2002 GEA 19171 Roots URAI Page 18 of 32...

Страница 19: ...ISRB_2002 GEA 19171 Roots URAI Page 19 of 32...

Страница 20: ...ISRB_2002 GEA 19171 Roots URAI Page 20 of 32...

Страница 21: ...ISRB_2002 GEA 19171 Roots URAI Page 21 of 32...

Страница 22: ...ISRB_2002 GEA 19171 Roots URAI Page 22 of 32...

Страница 23: ...ISRB_2002 GEA 19171 Roots URAI Page 23 of 32...

Страница 24: ...ISRB_2002 GEA 19171 Roots URAI Page 24 of 32...

Страница 25: ...ISRB_2002 GEA 19171 Roots URAI Page 25 of 32...

Страница 26: ...ISRB_2002 GEA 19171 Roots URAI Page 26 of 32...

Страница 27: ...ISRB_2002 GEA 19171 Roots URAI Page 27 of 32...

Страница 28: ...ISRB_2002 GEA 19171 Roots URAI Page 28 of 32...

Страница 29: ...ISRB_2002 GEA 19171 Roots URAI Page 29 of 32...

Страница 30: ...ISRB_2002 GEA 19171 Roots URAI Page 30 of 32...

Страница 31: ...ISRB_2002 GEA 19171 Roots URAI Page 31 of 32...

Страница 32: ...improve our products and services and for over 160 years our world has revolved around our customers This dedication means our air and gas handling equipment adds maximum value to your operations We h...

Отзывы: