14
4 217 901 / 02
INSTAllATION
2.5
Fitting the pedestal casing
Attach the syphon (18, Fig. 07), which is sup-
plied loose, including double nipple (18a).
11. Place the condensate box (option) under the boiler
and establish the electrical connection. Make the
condensate drain or connection line according to se-
parate instructions.
For UltraGas
®
(1550):
Fit condensate drain pipe (18, Fig. 07) (supplied with
the boiler)
18 a
18
19
Fig. 07
12. Screw the right and left side walls (20, 21, Fig. 08)
using the cap nuts already mounted on the boiler foot.
13.
Hook in the front (22, Fig. 08) on the side walls (19,
20).
20
21
22
Fig. 08
23
14. Hook the front cover in (22, Fig. 06, Fig. 08) at the
bottom and slide shut at the top.
Fig. 09
If you are using the variant with shortened boiler feet or
you place the boiler on a concrete pedestal, you will have
to shorten the supplied conductors (saw off at the watch)
or extend them.
Содержание UltraGas 1550
Страница 47: ...47 4 217 901 02...