9
4 214 858 / 01
ASSEMBLY
2.3
Fitting the thermal insulation
1. Check that the size of the right and left casing sup-
port rail (1, Fig. 02) matches the dimensions given
(tolerance ± 1mm).
2. Place the insulation mat (2, Fig. 02) around the boi-
ler body (with the joint on the right, black side facing
outwards).
3. Attach the insulation mats using two plastic tapes and
- there are also tension springs (4, Fig. 02) for addi-
tional attachment
- Do not pull the tapes too tight (this would reduce the
insulation value)
1. Place insulation mat (5, Fig. 02) on the front of the bo-
iler and insulation mat (6, Fig. 02) on the back of the
boiler and secure in position with the retaining discs
Fig. 02
5
3
7
Fig. 03
Fig. 04
1
2
6
4
1415
±
1
Typ
UltraOil
®
(1
10-200)
1482
±1
Typ
UltraOil
®
(250,300)
779
+1
0
Typ UltraOil
®
(110-200)
834
+1
0
Typ UltraOil
®
(250,300)
Содержание 42-UltraOil 110
Страница 39: ...39 4 214 858 01...