Quick Installation Summary
This section provides the bare essentials for installing a HotZone™ heater. Refer to the rest of this manual for
detailed instructions and warnings.
Appendix C
16
1.
Place heater to project heat onto the work area from above and the side. Mount the heater in a safe
location by complying with the distances to the combustibles on all sides of the heater including items
that may be moved under the heater. Use the universal mounting bracket when possible.
2.
Install the heater so that the junction box is on the low side of the heater. Failure to do this may result in
overheating the junction box, early heater element failure, and will void the warranty.
3.
Connect to the correct voltage in a NEC approved circuit with supply wires suitable for 90° C (194° F).
Provide for controls that allow each heater to be turned off and/or staged for low/high voltage operation.
Wire according to schematics shown below depending on element type.