STEP 3 :
A. Pin vertical adjuster bracket to right bushing on top
of axle using 5/8" drawpin.
B. Secure diagonal channel to left bushing on top of axle,
and top hole on vertical adjuster bracket,
using 5/8" x 6" bolts and locknuts.
C. Pin top rail bracket to top of diagonal channel
at desired setting, using 5/8" drawpin.
STEP 4 :
A. Set 4" x 4" top rail on top rail brackets and start 1/2" U-bolts & locknuts.
Before tightening, top rail must be centered from front to back.
B. Mount adjustable shoes on bottom rail tube
(see step 5 & 6 for detailed shoe assembly instructions).
C. Mount ratchet assembly on bottom rail
wherever convenient for tie down.
Top Rail Bracket
Vertical Adjuster Bracket
Diagonal Channel
5
8
" Drawpin
5
8
" x 6" Bolt
1
2
" U-bolts
For mounting, undo these nuts to allow shoe assembly
to drop down over bottom rail tube. Hold lock handle in
locked position and tighten nuts until desired tension is acquired.
- 3 -