background image

STEP 3 :

A.  Pin vertical adjuster bracket to right bushing on top 
     of axle using 5/8" drawpin.
 
B.  Secure diagonal channel to left bushing on top of axle,
     and top hole on vertical adjuster bracket, 
     using 5/8" x 6" bolts and locknuts.
 
C.  Pin top rail bracket to top of diagonal channel
     at desired setting, using 5/8" drawpin.

STEP 4 :

A.  Set 4" x 4" top rail on top rail brackets and start 1/2" U-bolts & locknuts.
     Before tightening, top rail must be centered from front to back. 
 
B.  Mount adjustable shoes on bottom rail tube
     (see step 5 & 6 for detailed shoe assembly instructions).
 
C. Mount ratchet assembly on bottom rail
    wherever convenient for tie down.

Top Rail Bracket

Vertical Adjuster Bracket

Diagonal Channel

5
8

" Drawpin

5
8

" x 6" Bolt

1
2

" U-bolts

For mounting, undo these nuts to allow shoe assembly 
to drop down over bottom rail tube. Hold lock handle in 
locked position and tighten nuts until desired tension is acquired.

- 3 -

Содержание CHCF25

Страница 1: ...BLY MANUAL CHCF25 CHCF30 4 Wheel Steer Combine Header Carrier HORST WAGONS 8082 Rd 129 Listowel ON N4W 3G9 Canada 519 291 4162 1 866 567 4162 Fax 1 519 291 5388 sales horstwelding com www horstwelding...

Страница 2: ...TABLE OF CONTENTS CHCF25 CHCF30 Included Parts 2 Step by Step Assembly Instructions 3 4 Adjustable Shoe Assembly Instructions 5 9 Spring Tongue Balancer 10 Light Bracket Installation 11...

Страница 3: ...lts 8 1 2 x 1 1 2 bolts 24 5 8 locknuts 16 1 2 locknuts 8 5 8 flat washer 4 9 hitch pins 2 diagonal braces 2 vertical adjuster brackets 2 top rail mount brackets 2 tie down brackets 2 adjustable shoe...

Страница 4: ...agram on pg 9 for double spring tongue balancer installation D Align front rear steering see Wheel Alignment notes Insert reach tube secure with 5 8 x 4 1 2 bolt locknut using last hole in reach tube...

Страница 5: ...brackets and start 1 2 U bolts locknuts Before tightening top rail must be centered from front to back B Mount adjustable shoes on bottom rail tube see step 5 6 for detailed shoe assembly instruction...

Страница 6: ...ombines with low lifting clearance Follow these instructions for set up Step A Remove pins Step B Remove pad assembly Step C Locate base pad on header carrier bottom rail to desired position Step 5 A...

Страница 7: ...pad for draper heads Follow these instructions for set up Step D Locate pad on header carrier bottom rail to desired position Step A Remove pins and clips Step B Swing 2 corn head plates 180 Step C Re...

Страница 8: ...r set up Step A Remove pins and clips Step D Locate pad on header carrier bottom rail to desired position Step B Swing 2 corn head plates and large pad assembly 180 and reinstall longer pin and clip S...

Страница 9: ...orm Follow these instructions for set up Step B Swing 2 corn head plates and large pad assembly 180 Step C Position back extension here and reinstall longer pin and clip Step D Reinstall shorter pin a...

Страница 10: ...t up Step A Remove pins and clips Step B Swing large pad assembly 180 Step C Position back extension here and reinstall longer pin and clip Step D Position corn head plates and reinstall shorter pin a...

Страница 11: ...ount 22 1513 1 4 5 8 x 1 1 2 Bolt Nut Lockwasher 11 1517 3 5 Double Spring Balancer Plate 22 1514 2 6 Double Spring Tongue Balancer Kit Included Parts Assembly Instructions 5 6 2 1 5 6 3 5 3 1 2 4 Bol...

Страница 12: ...ts Light Kit Installation optional A Secure mounting brackets illustrated below B Run wire lead forward on outside of reach tube and along side of tongue through loop Secure exposed wire using wire cl...

Отзывы: