2.2 

Equipment Setup / Network 

 

• 

Interaction with the PCU100 (PCU) requires a 

OCS

.  Although the PCU does not have a local 

operator interface, it does support a remote operator interface through an OCS over a 

CsCAN

 

network.

 

 

• 

As shown in 

Figure 1

, the PCU is connected to a Hewlett Packard (HP) printer with the cable that 

comes with the PCU.  The cable connects the PCU to 

any Hewlett-Packard printer

 with IEEE 

1284 parallel port and that uses PCL3 or greater. 

 
 

Note:

  Our example uses one PCU, but multiple PCUs can be connected to the CsCAN network.  

 
 
 
 
 
 
 
 
 
 
 
 

 

Figure 1 - PCU Setup in a CsCAN Network

 

 
 

2.3 

Interface Configuration Software 

 

Cscape

 software is used to interface the PCU to the OCS over a 

CsCAN network

.     

 

2.4 Ladder 

Programming 

 
You need to build a ladder program (subroutine or sequence) that uses NETPUT and NETGET to 
configure and control the PCU.  Examples of ladder code programs are shown in 

Figures 3 through 6.  

Also, refer to 

Tables 1 through 2

.    

 

 
 

OCS 

Controller 

 
 

PCU100 

 
 

HP Printer 

Configured over 
CsCAN Network 

Cable  

(Sent with PCU.) 

 

-Configure with 
Cscape Software.  
-Program with Ladder 
Code. 

Содержание HE800PCU100

Страница 1: ...face using pre programmed controls Connects to any Hewlett Packard printer with IEEE 1284 parallel port and that uses PCL3 such as HP Deskjet 5650 Provides customized reports such as alarm or industry specific reports available for additional cost by contacting Horner Sales staff An example of a data trend report is on the last page of this document 2 Configuration Overview 2 1 Brief Summary of St...

Страница 2: ...nd that uses PCL3 or greater Note Our example uses one PCU but multiple PCUs can be connected to the CsCAN network Figure 1 PCU Setup in a CsCAN Network 2 3 Interface Configuration Software Cscape software is used to interface the PCU to the OCS over a CsCAN network 2 4 Ladder Programming You need to build a ladder program subroutine or sequence that uses NETPUT and NETGET to configure and control...

Страница 3: ...ter OCS The default screen appears b At the top of the menu bar click on the Program tab c Select Network Config from the pull down menu d Click the Option tab The following Network Configuration screen appears Figure 2 Network Configuration Screen e Click the Network Required box to the other network options f Click the Network Optimized box to speed network transfers g Fill in the Number of Netw...

Страница 4: ...CLEAR DATA Momentary QG5 1 M5 SCALE RANGE Time Toggle On state 0 25 minutes samples every 3 seconds Off state 0 25 hours samples every 30 seconds AQG1 1 R1 Customer name field length Number of charters in customer field AQG2 1 R2 Customer name field 30 ASCII Characters max 15 registers AQG1 2 R21 Job number field length Number of characters in job number field AQG2 2 R22 Job number field 30 ASCII ...

Страница 5: ...through the code and relate it back to the register assignments in the Tables 1 and 2 Note For all ladder code examples the Master OCS uses ID 1 through 4 The PCU uses default ID 10 You need to build a ladder program subroutine or sequence that uses NETPUT and NETGET to configure and control the PCU Examples of ladder code programs are shown in Figures 3 6 Figure 3 Example Ladder Code HeartBeat ...

Страница 6: ...PAGE 6 19 APR 2005 MAN0790 01 Figure 4 Example Ladder Code Command Controls and Customer Name Fields Figure 5 Example Ladder Code Job Number and Purchase Order Fields ...

Страница 7: ...h M4 to zero This references interface controls Print Trend Cancel Print Store Data Clear Data 3 Set M5 as desired for the sample rate This references the Scale Range which indicates the time interval that each sample occurs 4 Enter the customer name job number and purchase order information including their respective lengths in R1 through R60 5 Set M3 Store Data to 1 to enable data capture Allow ...

Страница 8: ... personal protective equipment including safety glasses and insulated gloves when making connections to power circuits Ensure hands shoes and floor are dry before making any connection to a power line Make sure the unit is turned OFF before making connection to terminals Make sure all circuits are de energized before making connections Before each use inspect all cables for breaks or cracks in the...

Страница 9: ...e OCS OCX e g OCS1XX 2XX Graphic OCS250 Remote Control Station Hardware RCS except RCS116 RCX e g RCS210 RCS250 MAN0227 Color Touch OCS Hardware e g OCS300 OCS301 OCS350 OCS351 e g OCS451 OCS551 OCS651 MAN0465 OCS LX Series Hardware e g LX280 LX300 RCS116 MAN0755 MiniOCS MiniRCS MiniOCX MiniRCX Hardware e g HE500OCSxxx MAN0305 Other Useful References Cscape Programming and Reference MAN0313 Device...

Страница 10: ...PAGE 10 19 APR 2005 MAN0790 01 NOTES ...

Отзывы: