Starting the Generator:
•
Make sure the 110v systems are off prior to starting the generator.
•
Ensure that you have switched from shore power to generator power (See Section 10)
•
Press the Prime switch for 5 seconds.
•
Press and hold the Start button until you hear the generator start.
•
Allow the generator to warm up for 5 minutes and then gradually load up the system (battery
charger and air conditioning units), adding one load every 2 minutes.
Stopping the generator
•
Turn off all 110v systems (air conditioning units and battery charger).
•
Allow the generator to run for 5 mins without load to cool down.
•
Push down quickly on the bottom of the switch and release.
•
The generator will shut down.
Generator fuses and relays behind STBD FWD cabin door.
GFCI switches are below
12-Volt panel. If there is
no power coming from
your outlets, ensure these
switches are in the on
position.
Содержание Lagoon 42
Страница 1: ...Information operations manual for Lagoon 42 Catamaran 2020 Blue Lagoon...
Страница 8: ......
Страница 22: ......