14
2-8
AttAchIng the horIzontAl stAbIlIzer And vertIcAl fIn
2-9
InstAllIng the tAIl boom
Temp.
(×
2)
Red
(×6
)
Flat Washer, M2.6
…………………×2
Socket Head Bolt, M2.6×4
……………×2
90°
CA
Red
(×
2)
Socket Head Bolt, M2.6×6
……………×6
Socket Head Bolt, M2.6×20
…×2
Socket Head Bolt,
M2.6 x 4 (2 Pcs)
Flat Washer, M2.6 (2 Pcs)
HG Tail Boom Holder (2 Pcs)
Tail Support Clamp
Horizontal Stabilizer
Vertical Fin
Socket Head Bolt, M2.6 x 20 (2 Pcs)
Socket Head Bolt, M2.6 x 6 (6 Pcs)
Note: Do not fully
tighten the M2.6x20
socket head bolts until
the belt tension is set in
a later step.
Note: Insert the tail boom as far
forward as it will go into the tail
boom holders; belt tension will be set
later in the assembly.
Note: Pay close attention to the direction of rotation of the belt. With the belt
installed as shown, sight down the tube to ensure that the belt is not twisted down
the length of the boom, then rotate the belt 90 degrees in the direction of the arrow to
ensure the tail blades rotate the proper direction and the belt is not twisted or kinked.
The tail blade rotation direction will be verified later in step 3-5.
Caution: If the belt is twisted or kinked it will cause premature wear and failure of the
belt which will cause loss of tail control.
Содержание Vibe 500e
Страница 47: ...47 6 1 Installing the Speed Controller 6 2 Installing the Receiver and Gyro 2 2 2 2...
Страница 48: ...48 6 3 Fixing the Wiring 6 4 Installing the Battery 2 2 6S Li Po Battery Not Included...
Страница 49: ...49 6 5 InstAllIng the body 2 2 Body Rubber Grommet 3 Pcs...
Страница 63: ...63 Record Information about your helicopter...