98
6. Move and Installation
6-3 SPF-20A Installation
6-3-3 Connection with a Collator
In-feed Conveyor
Connecting Plate
Delivery Section
Sheet Flow
Collator
Delivery Conveyor
Connectors
Leveling Bolts (3 pcs)
Mounts (3 pcs)
1.
Attach connecting plate.
2.
Raise collator delivery section angle.
3.
Adjust the collator delivery section
height and the SPF-20A in-feed conveyor
height with leveling bolts.
NOTE
- Level SPF-20A using 3 leveling bolts.
4.
Connect 2 connector to collator.
5.
Hang delivery conveyor on hanger bolts
NOTE
- When FC-20A is combined, attach delivery
conveyor on FC-20A referring to the FC-20A
installing procedures.
6.
Attach stack plate on delivery conveyor
and connect conveyor cable to SPF-20A.
SPF-20A
Stack Plate
Conveyor Cable
*The connection of the SPF-20A with the HOF-30/-20
or ST-40 is explained in the operation manual of
each machine.