Be
FO
re
YOU
Be
GiN
1
iNT
rODUC
TiON
im
PO
rT
ANT
Pre
CA
UT
iONS
AS
Sem
BL
Y
Be
FO
re
YOU
Be
GiN
eLL
iP
TiC
AL
OP
er
AT
iON
Limi
Te
D
W
Arr
ANTY
Tr
OUBL
eSHOO
TiNG
&
m
AiNT
eNANC
e
COND
iT
iON
iNG
GU
iD
eL
iN
eS
Be
FO
re
YOU
Be
Gi
N
AS
Sem
BL
Y
1
iNT
rODUC
Ti
ON
im
PO
rT
ANT
Pre
CA
UT
iONS
eLL
iP
Ti
CAL
OP
er
AT
iON
COND
iT
iON
iNG
GU
iD
eL
iN
eS
Tr
OUBL
eSHOO
Ti
NG
&
m
Ai
NT
eNANC
e
Limi
Te
D
W
Arr
ANTY
RIGHT LOWER LINK ARM
U-BRACKET
SPLIT TEFLON WASHERS (I)
FLAT WASHER (J)
BOLT (K)
CONNECTING TUBE
SPACER (H)
RIGHT PEDAL ARM
Open HArDWAre BAG FOr STeP .
Align the U-BrACKeT on the riGHT LOWer LiNK Arm with the CONNeCTiNG TUBe on the riGHT
PeDAL Arm.
Slide the SPACer (H) through the U-BrACKeT and the CONNeCTiNG TUBe so that it can no longer
rotate.
Insert 2 SPLiT TeFLON WASHerS (i) between the CONNeCTiNG TUBE and the U-BrACKeT.
Secure the joint with a FLAT WASHer (J) and BOLT (K).
Repeat on the other side.
A
B
C
D
e
F
SPLIT TEFLON
WASHER (I)
28 mm
Qty: 4
SPACER (H)
72 mm axis
Qty: 2
FLAT WASHER (J)
35 mm
Qty: 2
BOLT (K)
15 mm
Qty: 2
HArDWAre BAG FOr STeP CONTeNTS :
ASSEMBLY STeP
ASSEMBLY STeP
SPACER RINGS (M)
LOWER HANDLEBAR
NUT (P)
FLAT WASHER (O)
BOLT (N)
LOWER LINK ARM
SPACER (L)
Open HArDWAre BAG FOr STeP .
Slide SPACer (L) into LOWer LiNK Arm.
Snap 2 SPACer riNGS (m) onto both sides of SPACer (L). While
holding SPACer riNGS (O), slide LOWer LiNK Arm into bottom
end of LOWer HANDLeBAr.
Insert 1 BOLT (N) into LOWer HANDLeBAr and secure using 1
WASHer (O) and 1 NUT (P).
Repeat on other side.
A
B
C
D
e
BOLT (N)
45 mm
Qty: 2
SPACER (L)
Qty: 2
SPACER RING (M)
Qty: 4
WASHER (O)
18 mm
Qty: 2
NUT (P)
18 mm
Qty: 2
HArDWAre BAG FOr STeP CONTeNTS :
Confirm that the
LOWER HANDLEBAR
and the LOWER LINK ARM
are marked R. The left
side is marked L.
E1201_Rev.1.4.indd 14-15
7/29/08 10:37:42 AM