background image

NOTE: It is better to mix it slightly wet 
than too dry. 

 

6. Insert the broomstick in 3 or 4 different places and vibrate up and down to 

settle the concrete. Submerge the four Anchor Footing Rebar (M) pieces 
into the center of the hole spaced evenly. Next set the anchor system into 
the wet concrete, vibrate it as it goes in to make sure the concrete fills in 
around the 16mm Anchor J-Bolts (K) hooks. Make sure the Anchor 
Footing Template (N) is pressed firmly against the top of the wet concrete. 
Use the level to ensure that it is level in all directions. Additionally, the 
center line of the 16mm Anchor J-Bolts (K) must be parallel with the edge 
of the playing surface (See 

figure C

).   

 

NOTE: The four 16mm J-Bolt Hex Nuts 
(L) on the bottom of the Anchor Footing 
Template (N) will be sacrificed into the 
concrete. 

 
 

STOP HERE!  

Allow footing to cure for 3-7 days before proceeding.

 

 

 

5

Содержание PD-P-G

Страница 1: ...not wear jewelry rings watches necklaces etc Objects may entangle in net Pro Dunk Platinum Basketball System MODEL NUMBER PD P G WELCOME TO THE FAMILY OF PRO DUNK OWNERS Thank you for purchasing our basketball system We try hard to ensure that our products are of high quality and free of manufacturing defects and of missing parts However if you have any problems with your basketball pole such as a...

Страница 2: ...uts K 4 16mm Anchor J Bolts L 8 16mm J Bolt Hex Nuts M 4 Anchor Footing Rebars N 1 Anchor Footing Template O 2 18mm X 30cm Hex Bolts P 3 18mm X 33cm Hex Bolts Q 6 18mm Lock Nuts R 8 10mm X 3cm Hex Bolts S 8 10mm Flatwashers T 8 10mm Lockwashers U 8 10mm Hex Nuts V 1 Rim Height Sticker W 4 Plastic and Steel Spacers X 1 20mm X 33cm Hex Bolts Y 1 20mm Lock Nuts Z 4 16mm Anchor J bolt Washers AA 1 Bla...

Страница 3: ... components and cross check against bill of materials Report any shortages to Hoops Inc customer service at 1 800 294 4667 3 Assembly is a two part process PART 1 PART 2 Day 1 Complete Anchor System Installation Instructions Below Day 5 Complete Pro Dunk assembly instructions Day 2 Allow concrete to cure Day 3 Allow concrete to cure Day 4 Allow concrete to cure 4 For safety measures have at least ...

Страница 4: ...of the way on to each 16mm Anchor J Bolt K Place the threaded end of each 16mm Anchor J Bolt K through the 4 holes located in the Anchor Footing Template N Then thread a second 16mm J Bolt Hex Nut L on to each 16mm Anchor J Bolt K until tight against the Anchor Footing Template N making sure to keep the 16mm Anchor J Bolt K hooks pointing in toward the center of the Anchor Footing Template N 4 For...

Страница 5: ...re the concrete fills in around the 16mm Anchor J Bolts K hooks Make sure the Anchor Footing Template N is pressed firmly against the top of the wet concrete Use the level to ensure that it is level in all directions Additionally the center line of the 16mm Anchor J Bolts K must be parallel with the edge of the playing surface See figure C NOTE The four 16mm J Bolt Hex Nuts L on the bottom of the ...

Страница 6: ...he Rim Height Indicator G which is plastic with a hole in one end over the hole in one of the second set of welded tubes in the Main Extension Arm B Attach both Spring Assist Cartridges E to the Main Extension Arm B using an 20mm X 33cm Hex Bolt X and 20mm Lock Nut Y In order to attach both Spring Assist Cartridges E at the bottom lower the open end of each Spring Assist Cartridge E down over the ...

Страница 7: ...cers W Insert them into four rim holes in the backboard This is very important to prevent backboard breakage CAUTION Do not proceed with rim installation without these spacers 19 Mount the rim to the H Frame Backboard Mount D and Backboard assembly using the hardware supplied in the rim box NOTE Use a level to make sure rim is level side to side before tightening nuts 20 After everything is square...

Страница 8: ...you d like to restrict height adjustment from 10 to 7 you can optionally insert the Black Safety Rod And Pin AA into the tube on the back of the Vertical Post A NOTE It is advisable to do so to avoid injury 8 ...

Страница 9: ...Installation Figures 9 ...

Страница 10: ...10 ...

Страница 11: ...h a 100 Cotton soft cloth lukewarm water and mild soap Do not scrub Rinse backboard with lukewarm water again Dry with 100 cotton soft cloth To minimize scratches and minor abrasions to your backboard Rim The goal should not be cranked under 5 6 or over 10 Adjustments of the goal should be done under adult supervision When attempting slam dunk activity you should always wear a mouth guard to avoid...

Страница 12: ...merchandise prior to authorization of warranty claims What is not covered by this warranty This warranty does not cover defects or damage due to improper installation shipping handling alteration accidents vandalism weather conditions rusting exposure to corrosives negligence misuse anything other than a type of basketball activity or related contact with the unit scratching scuffing or any event ...

Отзывы: