NOTE: It is better to mix it slightly wet
than too dry.
6. Insert the broomstick in 3 or 4 different places and vibrate up and down to
settle the concrete. Submerge the four Anchor Footing Rebar (M) pieces
into the center of the hole spaced evenly. Next set the anchor system into
the wet concrete, vibrate it as it goes in to make sure the concrete fills in
around the 16mm Anchor J-Bolts (K) hooks. Make sure the Anchor
Footing Template (N) is pressed firmly against the top of the wet concrete.
Use the level to ensure that it is level in all directions. Additionally, the
center line of the 16mm Anchor J-Bolts (K) must be parallel with the edge
of the playing surface (See
figure C
).
NOTE: The four 16mm J-Bolt Hex Nuts
(L) on the bottom of the Anchor Footing
Template (N) will be sacrificed into the
concrete.
STOP HERE!
Allow footing to cure for 3-7 days before proceeding.
5