Honeywell TrueZONE ARD Series Скачать руководство пользователя страница 4

TRUEZONE ARD, EARD, AND ZD SERIES DAMPERS

33-00040—01

4

WIRING

CAUTION

Personal Electrical Shock Hazard. Can cause 

electrical shock or equipment damage.

Disconnect power before beginning installation.

The damper motor has a 24 Vac, 50/60 cycle, 8 VA rating. The 

spring-return ARD and ZD damper requires 24 Vac to the two 

motor leads to power the damper closed. The damper then 

returns to its normal open position once power is removed. 

EARD damper requires 24 Vac to the two motor leads to 

power the damper open. The damper then returns to its 

normal closed position once power is removed.

NOTE: Multiple dampers can be wired in parallel.

Wiring a Motor

See Fig. 3 and 7 for motor wiring hookups for ARD and ZD 

Dampers

Changing Motor on ARD, EARD and 

ZD Dampers

1.

Disconnect the motor wiring.

2.

Loosen the socket head cap set screw located between 

the faceplate and the motor coupling.

3.

Remove the motor.

4.

Ensure damper blade is in the open position with the set 

screw pointing toward the open position on the label.

5.

Attach new motor to the coupling; be sure the standoff 

on motor is positioned in the grommet on the faceplate 

and the set screw is aligned with the motor shaft hole.

6.

Tighten the set screw.

Wiring a Single ARD (Power Closed) 

to a Control Panel

Fig. 3. ARD configured as power closed.

Checkout

CAUTION

Possible Equipment Damage

Do not manually open or close the damper as this can 

damage the actuator.

To check out the ARD:

1.

With 24 Vac applied to the motor leads, observe the 

motor powering the damper to the closed position.

2.

When energized, verify that the actuator connection 

coupling rotates in a clockwise direction (as viewed from 

the operator base end) and that the damper shaft turns 

with the coupling.

3.

With power removed, observe the damper returning to 

the normally-open position.

NOTE: To remove power, disconnect one wire from the 

motor.

4.

If the motor does not operate smoothly and without hes-

itation throughout the complete opening and closing 

stroke, examine the damper and the shaft for free rota-

tion within the duct.

M14843

ARD CONFIGURED

AS POWER CLOSED

CLOSED

M6

OPEN

M4

COMMON

M1

Содержание TrueZONE ARD Series

Страница 1: ...Male crimped and female uncrimped ends to connect to any rigid or flexible round duct Rated to operate up to 1 in wc Blade closes off tightly against gasket for minimal leakage Fail safe normally open operation Simple easy to wire two wire installation with a third wire option M4 for LED open only light EARD Features Adjustable open position range stops Shipped as power open spring return closed d...

Страница 2: ...eans Direct connection to damper shaft Motor Mounting Position Multi poise Motor Dimensions See Fig 1 Construction ARD Dampers Frame Galvanized steel spiral duct crimped on down stream side ARD Sizes 5 in 6 in 7 in 8 in 9 in 10 in 12 in 14 in 16 in 18 in and 20 in diameters Gauge ARD5 ARD12 24 Gauge frame and 22 Gauge Blade ARD14 ARD20 22 Gauge frame and 20 Gauge Blade EARD Dampers Frame Galvanize...

Страница 3: ...r checkout and maintenance The ZD comes complete and ready for installation The motor and linkage are factory assembled to the damper The damper is assembled for installation and wiring to the control panel Selecting Damper Size To ensure correct operation be sure to select the correct zone damper size for the air duct IMPORTANT Be aware that damper sizes are built 5 32 in smaller than the listed ...

Страница 4: ... set screw pointing toward the open position on the label 5 Attach new motor to the coupling be sure the standoff on motor is positioned in the grommet on the faceplate and the set screw is aligned with the motor shaft hole 6 Tighten the set screw Wiring a Single ARD Power Closed to a Control Panel Fig 3 ARD configured as power closed Checkout CAUTION Possible Equipment Damage Do not manually open...

Страница 5: ... G AT120 W8150A EARD 6 HVAC W C RC Y G G RC CC CH W G TH8110U R C DAMPER AUX REMOTE M23547 M23591 HVAC W C R Y G VISIONPRO TH9000 THERMOSTAT H U M D H M V N T OR 1 2 3 C R RC RH 24 VAC COMMUNICATION TERMINALS COMMUNICATION LED W1 W2 W3 Y Y2 G O B AUX AUX2 Y Y2 G CONV HP L NOT USED 1 2 1 2 SYSTEM MONITOR NOT USED OUTDOOR TEMP SENSOR INDOOR TEMP SENSOR DISCHARGE AIR TEMP SENSOR 1 2 D A T S O U T I N...

Страница 6: ...TABLE 1 0 3 ENVIRACOM FURN NO YES 4 PURGE TIME 2 MIN 3 5 MIN 5 PURGE FAN HVAC PANEL 6 PURGE DAMPER NO CHG OPEN 7 COMP STAGES 1 2 8 HEAT FAN HVAC PANEL 9 HP CHANGEOVER O B 10 UNUSED O N 1 2 3 4 5 6 7 8 9 10 1 2 CONV HT STG 1 1 1 1 0 2 0 1 3 0 0 HP 24 VOLT 40 VA TRANSFORMER R C L1 L2 R W1 W2 Y1 Y2 G C DOTTED LINES FOR 2 STAGE APPLICATIONS SINGLE TRANSFORMER HEATING COOLING SYSTEMS REQUIRE A JUMPER T...

Страница 7: ...hat requires 24V to the two motor leads to power the damper closed When power is removed from the motor the damper springs back to its normally open position When used with Honeywell Networked Zoning use closed and com terminals Fig 7 Power closed spring return open ZD wiring Wiring Multiple Dampers When the same zone controls two or more dampers wire the dampers in parallel to terminals M1 and M6...

Страница 8: ...RS Automation and Control Solutions Honeywell International Inc 1985 Douglas Drive North Golden Valley MN 55422 customer honeywell com U S Registered Trademark 2015 Honeywell International Inc 33 00040 01 M S 02 15 Printed in United States ...

Отзывы: