Once the required minimum testing time has 
been reached, the measurement can be termi-
nated – marker 4.

 4 

  Briefly press the selection key   in order to end 

the measurement.

 

Measurement on the unit under test stops au-
tomatically once the full number of measuring 
unit revolutions has been completed – marker 5.

 

A beep acknowledges the end of the measure-

ment.

 

Measurement is terminated automatically after 
5 hours.

 5 

 Stop the test on the master meter – marker 6.

 

The measurements are then available.

 6 

 Read off the flow rate on the master meter or 

calculate if necessary:

 

a)  taking into account the inherent error of the 

master meter:

   Q

act,N

 = V

N

 x 3600 s/h / ((1+F

N

/100) x Δt

N

)

 

b)  If the inherent error of the master meter has 

already been taken into account in the dis-
played volume (V

N

 = V

act,N

):

   Q

act,N

 = V

act,N

 x 3600 s/h / Δt

N

 7 

 Calculate the flow rate on the unit under test: 

Q

P

 = V

P

/Δt

P

 

for BK-G...ET, the following applies: V

P

 = V

b15

 8 

  The accuracy is checked by comparing the flow 

rates. The pressure and temperature values of 
the unit under test corrected with reference to 
the master meter have already been taken into 
account here:

 

F

P

 = 100% x (((Q

P

 x p

P

 x T

N

) / (Q

act,N

 x p

N

 x T

P

)) - 1)

 

The following applies:

 

 p

P

 = relevant absolute pressure on the unit under 

test

 

The following also applies:

 

for BK-G...E: T

P

 = (273.15 + {t

g

}) K

 

 where  t

g

 = relevant gas temperature on the unit 

under test in °C (display)

 

for BK-G...ET: T

P

 = (273.15 + {t

b

}) K

 

 where  t

b

 = 15°C (see page 15 (Technical data)): 

T

P

 = 288.15 K

 

for BK-G...ETe:

 

 If  Q

P

 in step 7 is determined from the converted 

volume V

b

, the following applies:

 

 T

P

 = (273.15 + {t

b

}) K (t

b

 see page 15 (Techni-

cal data))

 

 If  Q

P

 in step 7 is determined from the non-con-

verted volume V

P

, the following applies:

 T

P

 = (273.15 + {t

g

}) K

 

 where  t

g

 = relevant gas temperature on the unit 

under test in °C (display)

 

The curly brackets mean “numerical value of”.

 

On a nozzle test rig with a known flow rate, 
steps 

  

 and

  6 

 can be omitted.

 

The error calculation is based on PTB Testing 

Instructions, Volume 29: “Messgeräte für Gas – 
Gaszähler” (Measuring instruments for gas – gas 
meters), Edition 2003.

Option : cyclic test with a given volume

Test load and minimum test volumes for the test with 

index readout:

Type

Q

max 

in 

m

3

/h

Cyclic 

volume 

in dm

3

Test volume in dm

3

 at

Q

min

0.2 Q

max

Q

max

BK-G1.6

2.5

1.2

36

72

72

BK-G2.5

4.0

1.2

36

72

72

BK-G4

6.0

1.2

36

72

72

BK-G2.5

4.0

2

60

120

120

BK-G4

6.0

2

60

120

120

BK-G6

10

2

60

120

120

BK-G6

10

4

120

240

240

BK-G6

10

6

180

360

360

BK-G10

16

6

180

360

360

BK-G16

25

6

180

360

360

BK-G25

40

12

360

720

720

Master meter test procedure

11

8

9

7

10

V

N

  

  To activate the cyclic test on the unit under test, 

briefly press the selection key   on the index – 
marker 7. The index will thus be “armed” for 
measurement.

  

 Start the test on the master meter – marker 8.

 

As soon as one of the significant sensor posi-

tions has been detected, the unit changes to 
measuring mode – marker 9.

  

 Test is ended – marker 10.

 4 

 Read off the test results on the unit under test.

 

The measured values are updated with each 1/8 

revolution of the measuring unit. 

 5 

  Compare the measurement results with the mas-

ter meter and determine the measuring deviation 
on the unit under test:

 

a)  taking into account the inherent error of the 

master meter:

 

   F

P

  =  100% x (((V

P

 x (1+F

N

/100) x p

P

 x T

N

) / 

(V

N

 x p

N

 x T

P

)) - 1)

 

b)  If the inherent error of the master meter has al-

ready been taken into account in the displayed 

volume (V

N

 = V

act,N

), the following applies:

 

   F

P

  =  100% x (((V

P

 x p

P

 x T

N

) / (V

act,N

 x p

N

 x 

T

P

)) - 1)

 

 The following applies: p

P

 = relevant absolute 

pressure on the unit under test

Содержание Themis alpha EI2

Страница 1: ...TION Indicates possible material damage All interventions may only be carried out by qualified gas technicians Electrical interventions may only be carried out by qualified electricians Conversion spare parts All technical changes are prohibited Only use OEM spare parts Changes to edition 12 13 The following chapters have been changed Checking the usage Logistics Contents D GB GB 1 1000106001 002 ...

Страница 2: ...al number BK G E S N EI2 Qmax Qmin V pmax class 1 5 class 1 5 Valve Ve tm tg M 0102 12345678 ATEX The electronic index is suitable for use in potentially explosive atmospheres For the exact use zone see ATEX sticker on the diaphragm gas meter or see the operating instructions for diaphragm gas meters BK G1 6 to BK G25 http docuthek kromschroeder com doclib main php language 1 folderid 400041 by_cl...

Страница 3: ...ill automatically change back to the main screen when no user key has been pressed for 30 s and switches off after a further 30 s You can navigate from the main screen to the various menus such as Meter information us ing the user keys Menu overview The display can differ depending on the parameteriza tion or communication module Main menu Valve release procedure Current meter reading Icon definit...

Страница 4: ...played with date and time for the start and end of the period The meter reading is displayed for the start and end of the period in m3 The consumption for this period is indicated in m3 The tariff band may be displayed Electronic index with communication module The symbol is displayed if for example the tolerance between the internal time recording and the actual time is too large This can lead to...

Страница 5: ... process until all the pixels are off and Test instructions appears in the menu area Service mode is activated Service mode menu overview Test instructions Temperature optional Date time LCD pixel test Cyclic test UMI peripherals UMI 1 UMI 2 UMI 3 Main menu Optional contents from communication module Battery diagnosis Meter information Test instructions ON Test instructions Automatic return to mai...

Страница 6: ...atus Change required Battery diagnosis U hlc 3 60 V U min 3 00 V Status Test in progress Time 05 00 h m Battery diagnosis U hlc 3 60 V U min 3 00 V Status Removed Date and time Information on the date and time display Date and time 10 01 2011 10 02 06 The operator can transfer the switchover be tween winter and summer time to the commu nication module provided that it supports this The date is giv...

Страница 7: ...ommunication is enabled for 1 minute If the optical communications link is not used during this time the interface will be deactivated 3 Initiate communication The procedure depends on your user software For further information refer to the operating instructions for communication modules type ECM for electronic index Changing the battery WARNING Risk of explosion in explosion hazard areas As a ge...

Страница 8: ...s must be confirmed at the meter on site by the consumer or another person if applicable 1 Establish the optical communications link see page 7 Establishing an optical communica tions link 2 Release the valve The procedure depends on your user software ON Valve open safety check CHECK IF APPLIANCES OFF HOLD FOR GAS Opening valve Please wait Gas flow check complete Gas flow check successful The tes...

Страница 9: ...ructions or the servicing steps provided by the relevant operator 6 Replace the service cover 7 Push in a new screw locking cap see page 14 Spare parts The body carrying out this task should apply its own seal Replacing the communication module 1 Establish the optical communications link see page 7 Establishing an optical communica tions link 2 Deactivate the respective communication mod ule BK G ...

Страница 10: ...n the unit under test in K tb base temperature in C Vb15 converted volume with reference to tb 15 C Vb converted volume with reference to tb There are two different options for carrying out the cyclic test Option 1 cyclic test at a constant flow rate The test rig is in pre trial operation i e start of measurement on the unit under test will be de layed Maintain the flow rate constant Test load and...

Страница 11: ...olume VP the following applies TP 273 15 tg K where tg relevant gas temperature on the unit under test in C display The curly brackets mean numerical value of On a nozzle test rig with a known flow rate steps 2 and 6 can be omitted The error calculation is based on PTB Testing Instructions Volume 29 Messgeräte für Gas Gaszähler Measuring instruments for gas gas meters Edition 2003 Option 2 cyclic ...

Страница 12: ...tions link has been established The procedure depends on your user software 1 Establish the optical communications link see page 7 Establishing an optical communica tions link 2 Interrupt communication to the installed commu nication modules before starting the test so that the measurement accuracy will not be adversely affected As of step 3 continue as described in one of the two following sectio...

Страница 13: ...nder test VP VP N x VImp N number of pulses VImp pulse value in m 9 Read off the volume on the unit under test The inherent error of the master meter is to be taken into account if applicable Vact N VN 1 FN 100 10 Determine the measuring deviation on the unit under test FP 100 x VP x pP x TN Vact N x pN x TP 1 The pressure and temperature values of the unit under test corrected with reference to t...

Страница 14: ...f point 5 Assistance in the event of malfunction Fault Cause Remedy Possible faults and suggested solutions The symbol is displayed If the symbol appears next to a measured value this means that the value is invalid After the next data synchronization the data are recorded again correctly and disappears When pressing the user keys the backlight ing and or display remain switched off A beep can nev...

Страница 15: ... is certified as part of the electronic index Communication modules Please contact the manufacturer for details on suit able communication modules Information on the ATEX suitability can be found in the operating in structions of the respective communication module The UMI interface features the following parameters UO 3 9 V peak 3 6 V nominal IO 7 5 A peak 506 mA nominal PO 1 55 W CO 12 µF LO 50 ...

Страница 16: ...ide Stafford ST16 3EF Tel 44 1785 275200 Fax 44 1785 275305 jeavons info gb elster com www elstermetering co uk Ireland Active Energy Control Ltd Unit 4 Clare Marts Quin Road Ennis Co Clare Tel 353 65 6840600 Fax 353 65 6840610 info aec ie www aec ie Germany Elster GmbH Strotheweg 1 49504 Lotte Tel 49 541 1214 0 Fax 49 541 1214 370 info elster instromet com www elster instromet com Contact ...

Отзывы: