![Honeywell PE SC1430 Скачать руководство пользователя страница 48](http://html.mh-extra.com/html/honeywell/pe-sc1430/pe-sc1430_planning-installation-and-service-manual_153434048.webp)
4. Platform Servicing
4.1. Servicing the PE SC1430-based Server
48
PE SC1430-Based Honeywell Server PE SC1430-Based Honeywell Server
12/2007
Honeywell
Release Independent
Step
Action
Attention:
Because of the weight (41 lbs, 18.6 Kg) and length of the server two people
should perform this procedure.
3
Remove the server from the cabinet and lay the system on its side
(horizontal) on a secure surface.
If using the server as a tower unit, lay the system on its side (horizontal) on
a secure surface.
4
Locate the release cover tab on top of the system.
5
Slide the release cover tab toward the rear of the system to release the
cover.