
3. Turn the Power button “ON”. Determine whether you want the hand dryer set to hot air or cool air.
Important Note:
Hot air setting will help dry hands quicker than cool dry setting. Refer to Figure 2 to
set to hot or cool setting.
4. Determine the mounting location. Refer to Mounting the Unit for recommended height settings.
a. Use the hand dryer base as a template to mark the 4 drill hole locations.
b. Drill the 4 holes and insert the supplied plastic anchors.
c. Mount the hand dryer to the wall using the supplied screws as show in figure 3.
4. Place the stainless steel cover back on the hand dryer as shown in Figure 4.
B. Installation Instructions – Hard Wire Installation
Hard wire installation should only be carried out by a qualified electrician to ensure the cables used and
installation is done in accordance with current local codes or regulations.
1. Disconnect the power source.
2. Use the supplied Allen key and carefully remove the stainless steel hand dryer cover. Pull the stainless
steel cover upwards to remove as shown in Figure 5.
6
3
4
5
Refer to
Mounting the Unit