3.5.2 Rack Mount Kit
The CM4 Rack Kit includes two custom slides and hardware for
installation in a customer-supplied standard 19 inch rack. For detailed
installation prints, ask for MDA drawing #874550-I.
Figures 3-3, 3-4, and
show rack mounting installation details.
1
2
3
4
1
4
7
2
5
8
0
3
6
9
MONITOR
STATUS ALARM
!
LOCATION
PROGRAM
RESET
ENTER
18.31
(465.0)
8.75
(222.0)
Feet
CM4 Gas Monitor
Figure 3-3: Rack Kit Dimensions
CAUTION
Verify power is Off before disconnecting customer I/O board.
Follow these points when installing the rack mount:
• Verify proper clearances and dimensions for instrument
placement. See Figure 3-3
• Remove feet
• Allow 9.00 inch (23 cm) height between units for proper
clearance
• Figure 3-4 shows right side fastener locations. Left side
installation is identical
• In the recessed position, make sure there is 3-1/4 inch (8.25
cm) clearance for the loop of slack cable as shown in
Figure
3-5
1
2
3
4
1
4
7
2
5
8
0
3
6
9
MONI
TOR
STATUS ALARM
!
LOCA
TION
PROGR
AM
RESE
T
ENTER
Figure 3-4: Mounting
3.25
(82.50)
Adjustable up to 28" between front/rear mounting rail
Figure 3-5: Cable Attachments
珠海司福斯特科技有限公司
www.safedtech.com