Honeywell C7355B Скачать руководство пользователя страница 2

C7355B IN-DUCT IAQ MONITOR

31-00440—01

2

SUPPORTED DOCUMENTS

• IAQ Monitor Submittal Data, 31-00439
• IAQ Monitor User Guide, 31-00438
• IAQ Monitor Quick Start Guide, 31-00441

INTRODUCTION

In-Duct IAQ Monitor is designed to be installed in outdoor 
or return air duct. It monitors PM2.5/PM10, CO2, TVOC, 
Temp/RH and their configurations. This device 
communicates over RS-485, and is easily integrating with 
the building automation system.Please read this 
instruction carefully before installing and using the 
device.

When installing this product

1.

Read these instructions carefully. Failure to follow 
them could damage the product or cause a hazard-
ous condition.

2.

Check the ratings given in the instructions and 
marked on the product to make sure the product is 
suitable for your application.

3.

Installer must be a trained, experienced service 
technician.

4.

After installation is complete, check the product 
operation.

5.

Be sure wiring complies with all applicable codes, 
ordinances and regulations.

WARNING

Electrical Shock Hazard
Can cause severe injury, death or property 
damage.

Disconnect the power supply before beginning 
installation to prevent electrical shock and 
equipment damage. More than one power supply 
may have to be disconnected.

Installation requirements

(IMPORTANT!)

For supply air applications, install the device on the 
main air duct where it is far from the supply air fan 
and branch ducts.

For return air applications, install the device on the 
main air duct close to the return air fan, or more 
than 1 meter from the return air outlet.

Installation of pitot tube should be accordance 
with the direction of the air flow.

The device should be installed in an accessible 
location that is convenient for regular mainte-
nance.

The power supply is 24VAC/VDC. Please note the 
power part must be waterproof and safe.

The pitot tube on each monitor of each device are 
calibrated as a pair. Ensure that the serial number 
on the monitor and pitot tube match. 

When removing and installing the pitot tube, the 
monitor must be powered off, it SHOULD NOT be 
connected to electricity. The pitot tube must be fit-
ted and tightened to avoid bad contact of tempera-
ture and humidity sensor.

IMPORTANT

To avoid electrical interference, which can cause 
erratic sensor readings, keep wiring runs as short 
as possible and do not run unit wires adjacent to 
the line voltage electrical distribution systems. Use 
shielded cable. The cable shield must be grounded 
only at the controlled equipment case.

WEEE (Waste of Electrical and 
Electronic Equipment)

• At the end of the product life, dispose of the 
packaging and product in an appropriate 
recycling center.
• Do not dispose of the device with the usual 
domestic refuse.
• Do not burn the device.

This symbol on our product shows a crossed-out 
“wheeliebin” as required by law regarding the Waste of 
Electrical and Electronic Equipment (WEEE) disposal. 
This indicates your responsibility to contribute in saving 
the environment by proper disposal of this Waste i.e. Do 
not dispose of this product with your other wastes. To 
know the right disposal mechanism please check the 
applicable law.

Check Accessories

Unpack the box and review monitor and the accessories 
according to below list.

1.

Instruction manual – 1 piece

2.

In-Duct IAQ monitor – 1 unit

3.

The pitot tube of monitor – 1 piece

4.

Waterproof connector – 1 piece

5.

Pipeline seal ring -1 piece

6.

Assembly screw – 2pcs; duct mounting screw – 2pcs

7.

Hexagonal screwdriver – 1 piece

8.

Filter – 1 piece

Содержание C7355B

Страница 1: ...d 230 VAC får endast utföras av behörig personal DK Opbevar denne vejledning sammen med regler eller med anlægsdokumentationen Elektrisk tilslutning for 230 VAC bør kun foretages af autoriserede personer N Denne veiledningen skal oppbevares sammen med regler eller anleggsdokumentasjonen Elektrisk tilkopling med 230 VAC må kun utføres av fagfolk FI Tätä ohjetta tulee säilyttää laitteen läheisyydess...

Страница 2: ... The device should be installed in an accessible location that is convenient for regular mainte nance The power supply is 24VAC VDC Please note the power part must be waterproof and safe The pitot tube on each monitor of each device are calibrated as a pair Ensure that the serial number on the monitor and pitot tube match When removing and installing the pitot tube the monitor must be powered off ...

Страница 3: ...32 F 122 F 0 C 50 C 10 60 RH Overall Dimensions See Fig 27 Net weight 1 87lb 850g Certification Standard CE FCC INSTALLATION Assembly of main unit and Pitot Tube 1 See markings on the main unit as shown in Fig 2 Turn counterclockwise to remove clockwise to attach The pitot tube must be matched with the original main unit with the same serial number Fig 2 2 The pitot tube is paired with the main un...

Страница 4: ...tot tube is rotated 90 degrees clockwise Fig 5 FOR AIR FLOW FROM RIGHT TO LEFT RIGHT IS THE FACTORY DEFAULT 1 Confirm the installation position and cut a hole with a diameter of 1 3 8 in in the air duct Insert the pitot tube into the air duct NOTE The side of the pitot tube marked with Windward Side should face the airflow direction Fig 6 2 Screw the pitot tube to the outside of the air duct Fig 7...

Страница 5: ...lling it on the air duct It is not recommended to reverse the sensor module unless it is absolutely necessary for daily operation 1 Unscrew the four assembly screws and open the upper casing part of the main unit Fig 10 2 Pull out the air inlet filter left side of Fig 11 from the lower right side of the sensor module and then remove the fixing screws on the middle of the mod ule right side of Fig ...

Страница 6: ... Fix the sensor module and insert the air inlet filter into the upper left slot of the module see Fig 14 Fig 14 5 Put the sensor compartment cover back in place and attach it with the original screws Fig 15 6 Install the pitot tube Confirm the installation posi tion and cut a 1 3 8 in diameter hole in the air duct NOTE The side of the pitot tube marked with Wind ward Side should face the airflow d...

Страница 7: ...IRING IMPORTANT All wiring must comply with local electrical codes and ordinances Follow equipment manufacturer wiring instructions when available Power must not be connected while wiring Wiring a unit that is powered may result in electrical shock and or equipment damage Wiring Diagram Fig 20 There are two sets of terminals power supply wiring on the left RS 485 wiring on the right 1 Remove the c...

Страница 8: ... terminal is the power terminal block The right terminal is the RS 485 terminal block 3 Run the power cable and RS 485 cable through each waterproof connector as shown in Fig 23 Fig 23 4 Connect the cables to the terminal blocks Fig 24 5 Plug the terminal blocks back onto the pin connec tors and tighten the waterproof connectors Fig 25 ...

Страница 9: ...C7355B IN DUCT IAQ MONITOR 9 31 00440 01 6 Replace the cover of the electrical wiring compart ment and tighten the screws Fig 26 ...

Страница 10: ...C7355B IN DUCT IAQ MONITOR 31 00440 01 10 DIMENSIONS AND MOUNTING HOLES Fig 27 Dimensions in in mm ...

Страница 11: ...C7355B IN DUCT IAQ MONITOR 11 31 00440 01 ...

Страница 12: ...chtree Street NE Atlanta GA 30308 customer honeywell com Honeywell Building Technologies Honeywell GmbH Böblinger Strasse 17 71101 Schönaich Germany buildings honeywell com U S Registered Trademark 2020 Honeywell International Inc 31 00440 01 M S 11 20 Printed in United States ...

Отзывы: