2.4 POST-INSTALLATION CHECKS
2.4.1 KTR 2280 MMDR SYSTEM CHECKOUT
The post-installation test is used to apply power and functionally checkout the system.
Successful completion of the post-installation test verifies the proper operation of the KTR
2280 MMDR.
TABLE 2-5 INSPECTION/CHECK PROCEDURE
is a visual inspection/check procedure
that should be performed after system installation as part of a system checkout. A
post-installation test per paragraph
2.4.1.2 POST-INSTALLATION CHECKOUT/
should be performed. In addition, the procedure should be used as a
periodic maintenance inspection check.
TABLE 2-5 INSPECTION/CHECK PROCEDURE
2.4.1.1 INSPECTION
Perform the following inspection on the overall system:
(1)
Check that cables do not interfere with aircraft controls or other equipment.
(2)
Check cabling for proper routing and check security of tie-down points. In-
spect and adjust cable runs to ensure that cables are not strained, kinked,
or severely twisted and are not exposed to rough or sharp surfaces.
EQUIPMENT
INSPECTION/CHECK PROCEDURE
KTR 2280
A. Inspect external surface for damage.
MMDR
B. Check that the unit is securely installed and that retaining
mechanism is securely tightened.
C. Ensure that all connections in the mounting tray are properly
mounted and secure.
Antennas
A. Inspect external surfaces for damage.
B. Check that antenna is properly mounted and mounting
screws are tight.
C. Ensure that antenna coaxial cable connectors are properly
mated and secure.
Содержание BENDIX/KING KTR 2280
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ...This Page Intentionally Left Blank ...
Страница 74: ...This Page Intentionally Left Blank ...