12

EN2R--9023 9705R0--NE

INSTALLATION AND WIRING

Installation

IMPORTANT

1.

Read these instructions carefully. Failure to follow

the intructions could damage the product or cause a
hazardous condition.

2.

Before installing or replacing any control check that

the test time is correct for the application. Never use
a type with a smaller test time than the calculated
test time for the application.

3.

Check the ratings given in the instructions and on

the product to make sure the product is suitable for
your application.

4.

The installation has to be carried out by qualified

.

personel only.

5.

Carry out a thorough checkout when installation is

.

completed.

Mounting Wiring Subbase

NOTE:

For installation dimensions, see Fig. 7.

1. The subbase can be mounted in any position. Make

sure that the LEDs indicating the test sequence and
faults--causes are clearly visible.

2. Select a location within an electrical panel. Be sure to

allow adequate clearance for servicing, installation and
electrical field connections.

3. For surface mounting, use the back of the subbase as a

template to mark the two screw locations. Drill the pilot
holes.

4. Securely mount the subbase using two M3.5 x 0.6

screws.

Wiring

CAUTION

1.

Disconnect power supply before beginning the
installation to prevent electrical shock, equipment
and control damage. More than one power supply
disconnect may be involved.

2.

Wiring connections are for the A4021A are
unique, therefore, refer to Table 3. and Fig. 7. for
proper subbase wiring.

3.

The A4021A must be installed with fixed wiring for
phase and neutral connections.

4.

Wiring must comply with all applicable codes,
ordiances and regualtions.

5.

After moving the A4021A valve proving system
from outdoor to indoor conditions, condensation
may occur. Do not connect condensated valve
proving system to mains.

6.

The A4021A is not suitable for phase--phase
mains., can only be used with phase -- neutral
mains.

7.

For each application diagram, local approval may
be needed

General considerations

There are two basic wiring diagrams:

valve proving before burner start--up: pre--configuration.

valve proving at end of heat demand: post--configuration.

Wiring

1. For proper subbase wiring, refer to Table 3.

2. Disconnect the power supply from the main disconnect

before beginning the installation to prevent electrical
shock and equipment damage. More than one
disconnect may be involved.

3. All wiring must comply with all applicable electrical

codes, ordnances and regulations.

4. Use the COM and NO contacts on both pressure

switches (LGPS and GPS).

5. Make sure loads do not exceed the terminal ratings.

refer to the label on the valve proving system, or to the
ratings in the Specifications, see Table 3.

6. Check the power supply circuit. the voltage and

frequency tolerance must match those of the valve
proving system. Add the required disconnect means
and overload protection.

7. Check all wiring circuits before installing the valve

proving system on the subbase

8. Install all electrical connectors.

9. Restore power to the panel.

Pressure switch

The pressure switch can be a normal normally open gas
pressure switch which is suitable for the appropriate pressure
levels and a voltage of 220 ... 240 Vac. Refer to the enclosed
instructions of the pressure switch. The switching point of the
GPS must be at 50 % of the nominal line--pressure.
Recommended gas pressure switch: C6058A

Содержание A4021 Series

Страница 1: ...plete the system When during the test sequence of the A4021 a failing valve is detected the A4021 will go into a non volatile lock out sta tus generates an alarm and prevents a burner start up The intended application is for gas fired power burners and other large capacity gas firing installations where according to the European norm EN676 a valve proving system can be used as an alternative for p...

Страница 2: ...Use of terminal 12 10 Fail safe relay drivers 10 Anti recycle counter 10 Calculations 11 General 11 Calculation examples 11 Installation and wiring 12 Installation 12 Mounting Wiring Subbase 12 Wiring 12 General considerations 12 Wiring 12 Pressure switch 12 General wiring diagrams 13 Applications with EC7850 14 Checkout 17 Final checkout of the installation 17 Troubleshooting 18 Standards and App...

Страница 3: ... chamber EN676 prescribes a valve proving system for capacity rating over 1 200 kW see Table 1 Table 1 Application valve proving systems according EN676 Heat Input With Pre Purge Without Pre Purge p kW Main Gas Start Gas Main Gas Start Gas kW 10 10 10 10 70 2 x B B 2 x B 2 x A or 2 x B VPS A 2 x A 70 1200 2 x A 2 x A 2 x A 2 x A VPS 2 x A 2 x A 1200 2 x A VPS 2 x A 2 x A 2 x A VPS 2 x A 2 x A NOTE...

Страница 4: ...ressure of the gas Non volatile lockout Automatic valve proving before heat demand after heat demand or during pre purge possible Different test times per valve available by different O S numbers Clear visual indication of the test sequence and faults causes through 5 LEDs Storage of fault code when line interruption occurs Can be applied in all common valve configurations 2 wire gas pressure swit...

Страница 5: ... S G P S gas air Servo Motor MT4000 Series Combi valve VQ400 Series Valve Proving System A4021 Series burner controller 7800 SERIES Gas pressure switches C6058A Series Fig 4 System set up Working principle The A4021 valve proving system is based on the pressure status principle This means that the valves are checked by means of measuring on off the pressure in the gas pipe between the two safety v...

Страница 6: ...elf test 10 alarm error during test valve 1 indefinite 11 alarm valve 1 failing leaking 5 indefinite 12 alarm error during test valve 2 indefinite 13 alarm valve 2 failing leaking 5 indefinite 14 alarm error heat demand indefinite 15 alarm self test error 4 indefinite 1 Timings depending on O S numbers shown A4021A1002 1010 2 STANDBY can be infinite time period 3 Depending on pre purge and start u...

Страница 7: ... demand lock out start heat demand reset burner controller Leak test GPS Valve V1 Vent valve normally open Valve V2 Leak test GPS Valve V1 Vent valve normally open Valve V2 PRE POST CONFIG CONFIG start whithout valve proving Fig 6 System sequence of A4021A in post and pre configuration 6 EN2R 9023 9705R0 NE ...

Страница 8: ...21A should be externally fused to prevent damage to the valve proving system wiring or peripherals External fuse 16 A slow max Internal fuse 5 A slow max Power consumption Maximum 4 5 VA Electrical ratings Valve outputs 4A cos ϕ 0 7 Vent valve output 1A cos ϕ 0 7 Ignition controller output 4A cos ϕ 0 7 Alarm output 2A cos ϕ 0 7 Electrical connection 4 Wiring conduit according to PG11 are provided ...

Страница 9: ...external devices n a 6 N N power Neutral for external devices n a 7 V2 IN V2 IN input Valve 2 voltage from ignition controller n a 8 V2 OUT V2 OUT output Output connect with Valve 2 4A 9 HD LGPS input Heat demand input pre configuration or LGPS input post configuration n a 10 ALARM ALARM input Alarm input 4A 11 ALARM ALARM output Alarm output 2A 12 RB RB input Read back signal for heat demand post...

Страница 10: ... 6 7 5 4 3 2 1 8 9 10 11 12 13 14 15 16 16 PG11 88 97 Fig 7 Mounting dimensions of A4021A and subbase in millimeters 74 5 80 96 60 5 80 96 8 5 34 5 86 5 52 69 4 5 4x 3 90 103 20 Fig 8 Mounting bracket A4021A for VQ400 and VE5000 Series in millimeters ...

Страница 11: ... terminal 12 and14 are connected If terminal 12 is not connected the A4021A will raise an alarm error heat demand Fail safe relay drivers The fail safe relay drivers which are used to give the heat demand to the burner controller are fail safe Anti recycle counter For reason that during each valve proving a small amount of gas enters the combustion chamber extra safety provisions are build in to p...

Страница 12: ... 9 10 13 5 65F 3 2 4 9 7 5 8 2 9 8 3 3 80F 4 4 6 9 9 4 12 14 5 0 100F 6 5 10 5 14 4 18 22 7 9 NOTE T Thread F Flange V0m volume of 2 valves with L 0 m IMPORTANT The total volume Vp has to be calculated with all volumes between the tested valves internal volumes of valves and all pipes Calculation examples Example 1 Calculate the maximum pipe length between two 1 1 2 safety valves when an A4021A va...

Страница 13: ...ring must comply with all applicable codes ordiances and regualtions 5 After moving the A4021A valve proving system from outdoor to indoor conditions condensation may occur Do not connect condensated valve proving system to mains 6 The A4021A is not suitable for phase phase mains can only be used with phase neutral mains 7 For each application diagram local approval may be needed General considera...

Страница 14: ...uration LGPS GPS Valve Proving System A4021A 6 N V2 8 10 ALARM vent valve 11 13 Ignition controller 4 N N L 1 2 T ext 12 14 heat demand input 9 15 main output V1 16 5 N reset fuse 3 L N 16A Vp 7 pilot output valve valve Fig 12 wiring diagram 3 valve configuration pre configuration LGPS GPS Valve Proving System A4021A 6 N V2 8 10 ALARM vent valve 11 13 Ignition controller 4 N N L 1 2 ext heat deman...

Страница 15: ...t pilot and vent valve to open atmosphere 13 LINE NEUTRAL EC7850 N 3 AL 4 L1 5 FAN 6 RT 7 LD2 8 PV1 9 MV 10 IGN F flame signal G ground 13 COM 12 HI 15 LOW 14 MOD 16 C V 18 ES1 17 ES2 19 ES3 20 LOS 21 PV2 22 SHTR EARTH ALARM FAN flame rod H D ign P S intermittent interrupted gas supply V1 V2 PV2 PV1 HI LO A4021A GPS 9 V1IN LGPS HD 10 OUT 11 VENT 15 V1OUT 16 RBHD 12 HD OUT 14 3 2 NO 1 7 V2IN 8 V2OU...

Страница 16: ...em with 3 valve configuration LINE NEUTRAL EC7850 N 3 AL 4 L1 5 FAN 6 RT 7 LD2 8 PV1 9 MV 10 IGN F flame signal G ground 13 COM 12 HI 15 LOW 14 MOD 16 C V 18 ES1 17 ES2 19 ES3 20 LOS 21 PV2 22 SHTR EARTH ALARM FAN flame rod H D ign P S intermittent interrupted A4021A GPS 9 V1IN LGPS HD 10 OUT 11 VENT 13 15 V1OUT 16 RBHD 12 HD OUT 14 3 2 NO 1 7 V2IN 8 V2OUT 4 5 6 N N N ALARM IN RESET LINE ext EXTER...

Страница 17: ...BY SELF RUN MODE OPERATE BURNER valves operated by ignition controller WAIT START UP 3 3 25 25 TEST GPS GPS TEST ERROR SELF Modes States 0 1 2 3 4 5 6 7 8 9 11 12 14 15 DEMAND HIGH TEST STANDBY Line voltage TEST LOW FOR OPERATION Sequence of operation V2 ERROR 10 V2 13 FAILING LEAKING V1 FAILING LEAKING WARNING No standard valve proving after lock out of the ignition controller blinking LED LED is...

Страница 18: ... and neutral are correct connected on the A4021A Exchanged connection of the phase and neutral can lead to hazardous situations when a short circuit in one of the valve connections occurs Therefore the A4021A can only be used with fixed wiring for the line voltage connections Make sure that phase and neutral are connected as instructed in the Wiring section Final checkout of the installation Set t...

Страница 19: ... A4021A NOTE Instructions for replacing the cover and fuse are given in the Service section Before making a replacement make sure you have the correct part check its part number and voltage rating Table 5 Troubleshooting A4021A Series valve proving System States ALARM V2 PWR RUN V1 OK Alarm mode Cause Action 10 Error V2 V2 is damaged or V2 is wrong not connected Check connections V2 and if necessa...

Страница 20: ... 6 ENV 50141 immunity to injected currents EN 50081 2 emission industrial level IEC 1000 4 2 electrostatic discharges IEC 1000 4 5 surges IEC 1000 4 11 voltage interruptions and decreases IEC 1000 4 4 fast transient bursts Standards and Approvals summarized The A4021A Series Valve Proving System is conform with the following EC directives Gas Appliance Directive 90 396 EEC PIN CE 0063AS1822 Low Vo...

Страница 21: ...oving System O S Number Rated V lt Test time l Power C Enclosure Functional description Remarks Voltage Vac per valve s Consump W gas pressure switch 3 valve config remote reset alarm output A4021A1002 220 240 25 5 IP40 2 wire yes yes voltage free New without subbase A4021A1010 100 120 25 5 IP40 2 wire yes yes voltage free New without subbase ZL030001 100 240 n a n a n a n a n a n a n a Subbase fo...

Отзывы: