Installation procedure overview 

Refer to the pages shown for details on each step. 

Step 

See page 

1. INSTALL FLASH MEMORY MODULE (IF PURCHASED SEPARATELY) 

3

 

2. MOUNT THE CONTROL STATION 

4

 

3. CONNECT TO EARTH GROUND 

6

 

4. MOUNT AND CONNECT POWER SUPPLY 

6

 

5. CONNECT COMMUNICATIONS 

7

 

 

1. Install Flash Memory Module (if purchased separately) 

Step Action 

With the 900 Control Station positioned face forward, and with connectors on the bottom, locate the 
Flash Memory Module receptacle through the access hole on the right side of the case.  

 

 

Insert the Flash Memory Module into the connector, being sure the card is fully engaged in its 
receptacle. Note the card is keyed to assure proper orientation. 

Note 

Control Station supports a minimum of 4MB and a maximum of 2GB Compact Flash memory card. 

Note 

The Flash Memory Module should not be installed or removed while the Control Station has power 
applied. 

 

 

 

 

 

 

 

Face 

Rear 

Содержание 900CS10-00

Страница 1: ...Using Station Designer software create data tags from your cde file create your operator interface configuration and save the sds file 4 Download the sds file to the 900 Control Station and verify operation Note Configuration of the 900 Control Station may be performed prior to mounting if found to be more convenient when using the USB port since once loaded the configuration is maintained in non ...

Страница 2: ...025 MANUFACTURED BY SANYO ENERGY CORP OR VARTA BATTERIE AG OR PANASONIC WARNING EXPLOSION HAZARD DO NOT CONNECT OR DISCONNECT CABLES WHILE POWER IS APPLIED UNLESS AREA IS KNOWN TO BE NON HAZARDOUS USB PORT IS FOR SYSTEM SET UP AND DIAGNOSTICS AND IS NOT INTENDED FOR PERMANENT CONNECTION WARNING EXPLOSION HAZARD THE AREA MUST BE KNOWN TO BE NON HAZARDOUS BEFORE SERVICING REPLACING THE UNIT AND BEFO...

Страница 3: ... Action 1 With the 900 Control Station positioned face forward and with connectors on the bottom locate the Flash Memory Module receptacle through the access hole on the right side of the case 2 Insert the Flash Memory Module into the connector being sure the card is fully engaged in its receptacle Note the card is keyed to assure proper orientation Note Control Station supports a minimum of 4MB a...

Страница 4: ...using a 3 16 inch 4 76mm size drill bit Remove any loose material from the mounting cut out to prevent that material from falling into the Control Station during installation 2 Mount the gasket by placing its 14 holes over the Control Station s 14 mounting bolts Push gasket all the way on to the mounting bolts Insert Control Station into panel cutout 3 Install the 14 kep nuts provided with the Con...

Страница 5: ...ing cut out to prevent that material from falling into the Control Station during installation 2 Mount the gasket by placing its 22 holes over the Control Station s 22 mounting bolts Push gasket all the way on to the mounting bolts Insert Control Station into panel cutout 3 Install the 22 kep nuts provided with the Control Station Tighten evenly for uniform gasket compression Do not tighten the ke...

Страница 6: ...s created via the Ethernet shield of the controller Other equipment connected to the unit may require isolation between signal common and earth ground To maintain isolation care must be taken when connections are made to the unit For example a power supply with isolation between its signal common and earth ground must be used Connecting a device via a USB cable may also connect signal common and e...

Страница 7: ...d connect the power supply s 24Vdc lead to terminal 2 and the Common lead to terminal 1 See figure below Plug the terminal block into the connector located on the bottom of the interface 5 Connect communications Overview Connections and ports used depend on the architecture of your installation See architecture examples starting on page 7 For cabling and connections see page 10 For details on conn...

Страница 8: ...CAT5 cable with RJ45 connectors Connect to HC900 Ethernet port On models C70 and C70R with two ports E1 and E2 either port can be used Example 3 Ethernet 10 100Base T 100m each HC900 Controller C70 CPU with 2 Ethernet ports 900 Control Station Experion LS SpecView or 3rd Party Software Use shielded CAT5 cable with RJ45 connectors Connect to HC 900 to E2 of the C70 CPU and connect the host PC to E1...

Страница 9: ...rminated ON 1 2 3 4 See manual 51 52 25 107 for full details Note Ethernet connections will provide faster performance than RS 485 Example 5 B A 100 base T Up to 100m 10 100 base T Ethernet Switch Ethernet or RS 485 Non redundant Experion LS SpecView or 3rd Party Software Dual Ethernet support HC900 Redundant Controller C70R CPU 900 Control Station Connect to C70R using either RS 485 or Ethernet C...

Страница 10: ... each Ethernet Switch HC900 Controller C30 C50 C70 CPU 900 Control Station 1 900 Control Station 2 900 Control Station 3 Up to 3 Control Stations may be connected to a HC900 controller using Ethernet Multiple stations via RS 485 are not supported Cables Ethernet Ethernet communications are recommended for best performance ...

Страница 11: ...of the shielded CAT5 cable 2 Connect the wires indicated to the 3 plug connector that was supplied with the HC900 CPU module See table below Shielded CAT5 cable 3 plug connector Signal Pin Terminal Shield aluminum polyester foil tape with 26 AWG stranded drain wire Connect to 1 TXA 2 Connect to 2 TXB 1 Connect to 3 RXA 3 RXB 4 TXEN 5 Common 6 TXB 7 Connect to 3 TXA 8 Connect to 2 3 Cut off any unu...

Страница 12: ...he station communicate with other Honeywell or Modbus compatible equipment create a communications cable as follows RJ12 connector Connector of slave device Terminal no Signal Terminal no Signal 1 CTS 7 RTS 2 RX 3 TXD 3 Ground 5 Ground 4 Ground 1 DCD 5 TX 2 RXD 6 RTS 8 CTS 1 6 5 1 9 6 4 3 2 8 7 ...

Страница 13: ...Ordinary Location Safety UL evaluated to CSA C22 2 No 61010 1 2004 Second Edition General Purpose Ordinary Location Safety UL CSA and FM Class I Div 2 Groups A B C and D Electromagnetic Compatibility IEC61326 2005 CE Mark EMC requirements for electrical equipment for measurement control and laboratory use Immunity to Industrial Locations ESD IEC 61000 4 2 Criterion A 4kV contact discharge 8kV air ...

Страница 14: ...ce without charge those items it finds defective The foregoing is Buyer s sole remedy and is in lieu of all other warranties expressed or implied including those of merchantability and fitness for a particular purpose Specifications may change without notice The information we supply is believed to be accurate and reliable as of this printing However we assume no responsibility for its use While w...

Отзывы: