42
OPERATION
AC PARALLEL OPERATION
Before connecting an appliance to either generator, make sure that the
appliance is in good working order and that its electrical rating does not
exceed that of the receptacle.
Most motorized appliances require more than their electrical rating for
startup. When an electric motor is started, the OVERLOAD ALARM
indicator (red) may come ON. This is normal if the OVERLOAD ALARM
indicator (red) goes OFF within 5 seconds. If the OVERLOAD ALARM
indicator (red) stays ON, consult your servicing dealer.
During parallel operation, the Eco-Throttle switch should be in the same
position on both generators.
1.Connect the parallel operation cable between two EU70is generators
following the instructions supplied with the parallel kit.
2.Start the engine on each generator and make sure each OUTPUT
indicator (green) comes ON.
3.Plug in the appliance following the instructions provided with the
parallel kit.
4.Turn on the appliance.
PARALLEL KIT
(optional equipment)
36Z376000.book 42 ページ 2014年9月19日 金曜日 午後6時26分
Содержание EU70is
Страница 93: ...90 MEMO 36Z376000 book 90 ページ 2014年9月19日 金曜日 午後6時26分 ...
Страница 185: ...90 NOTES PERSONNELLES 33Z376000 book Page 90 Thursday September 25 2014 10 07 PM ...
Страница 186: ...Honda EU70is BEDIENUNGSANLEITUNG Originalbetriebsanleitung 34Z376000 book Page 1 Thursday September 25 2014 9 59 PM ...
Страница 277: ...90 MEMO 34Z376000 book Page 90 Thursday September 25 2014 9 59 PM ...
Страница 369: ...90 MEMO 3LZ376000 book Page 90 Thursday September 25 2014 10 17 PM ...
Страница 371: ...36Z376000_WIRING_DIAGRAM fm 51 ページ 2014年9月17日 水曜日 午後12時30分 ...