background image

Assembly Instructions 3/5

Figure 4

STEP 3

Turn unit upside down.

Attach Casters to unit with Wood Screws for Caster

into pre-drilled holes, with Locking Casters at front.

(See Figure 2)

Note: Arrow label indicates front of unit.

STEP 4

Turn unit over to its
upright position.

Attach Rack Side (I) to unit
with Head Cap Bolts.
(See Figure 3)

Slide Rack Base (K) and
Pipes (J) into Rack Side (I).

Attach Rack Side (H) to unit
with Head Cap Bolts.

Attach Towel Bar (L) to unit
with Head Cap Bolts
for Towel Bar. (See Figure 4)

H

L

J

Figure 2

Figure 3

K

I

Head Cap Bolt

Arrow label at front

Head Cap Bolt for Towel Bar

Locking Caster

Non-Locking Caster

Head Cap Bolt for Towel Bar

Head Cap Bolt

Wood Screw for Caster

Отзывы: