F
E
8
B
D
2
A
C
7
3
6
5
"R" Marking behind
the Headboard & Leg
"L" Marking behind
TIPS :
Lay down the unit. To make
the installation work easier.
2/4
STEP 1 / ÉTAPE 1
STEP 2 / ÉTAPE 2
STEP 3 / ÉTAPE 3
STEP 4 / ÉTAPE 4
Страница 1: ...LSF Leg Pied Footboard Pied de lit Side Rail Longerons Drawer Slat Latte de tiroir Slat 3 Holes Latte 3 trous Slat 2 Holes Latte 2 trous Center Rail Longeron central Drawer Tiroir Drawer Slat Cover C...
Страница 2: ...2 A C D D 7 3 2 6 5 R Marking behind the Headboard Leg L Marking behind the Headboard Leg TIPS Lay down the unit To make the installation work easier 2 4 STEP 1 TAPE 1 STEP 2 TAPE 2 STEP 3 TAPE 3 STE...
Страница 3: ...wer closes tightly Move T runner at footboard to drawer slat G 2 G 1 G After insert the drawer please fasten the T Runner on the drawer slat with screw E 3 4 STEP 6 TAPE 6 STEP 7 TAPE 7 STEP 5 TAPE 5...
Страница 4: ...f the footboard Then fasten the drawer slat cover on the wooden support using screws K L 4 7 2 1 I J K Adjust the leveler until touch the floor I F L N wooden support E I J I J 4 4 STEP 11 TAPE 11 STE...