ASSEMBLY
1 Assembly the Runners
The Runners have a Left and Right Front and Back Runner (C&D).
For both Left and Right Runners align the Front and Back Runners
together and insert the connecting rods into the connecting holes.
Secure at the connecting loop with the Bolt and Wingnut (I).
2 Assembly the Runner Stabilizing Bars
Insert the "L" Shaped ends of the three Stabilizing Bars (H) into the
corresponding holes on the left and right runners to secure them in
position.
3 Assembling the Seat Panel to the Runners
Insert the metal connecting rods at the bottom of the Seat Panel (F) into
the connecting holes on the top of the Left and Right Runners. Secure
with Plastic Ties (K) around the metal frames.
4 Assembling the Front and Back Side Panels
For both the Left and Right Front and Back Side Panels (A&B) insert the
connecting rods on the back edge of the Front Panels into the connecting
holes on the front edge of the Back Panels. Insert the connecting rods on
the bottom of the Side Panels into the connecting holes on the top of the
Runners. Secure all parts with Plastic Ties (K).
5 Assembling the Front and Back Panels
Insert the connecting rods on the Back Panel (E) into the connecting
holes on the top back corners of the two Side Panels and the back edge
of the Seat panel. Insert the connecting rods on the Front Panel G) into
the connecting holes on the top front corners of the two Side Panels
and the front edge of the Seat Panel. Secure with Plastic Ties (K).
6 Securing the Sleigh with Bolt & WingNut
Secure the front edge of the two Side Panels to the Runners using the
Bolt and Wingnuts (I) provided.
7 Inserting
the
Plastic Ties to the Sleigh
Secure the different parts of the Sleigh together using the Plastic
Ties (K) provided.
8 Securing the Sleigh to the Ground
Secure the Sleigh to the ground using the metal Ground Stakes (J)
provided. The hooked end of the Ground Stake should go over the
metal frame and four corners then into the ground.