CLEANING, MAINTENANCE, STORAGE, DISPOSAL
49
BB810SMART-G
15.4
Operation
•
Place a log onto the track and secure it with the
log assembled supports.
•
Set desired cutting height.
•
Start the engine
•
Let the engine warm up
•
Turn on the lubrication.
•
Increase cutting speed by operating the throttle
on the handle.
NOTICE:
Slowly tighten the throttle handle to avoid
stalling the engine
•
Slide saw head slowly over the track until cut has
been finished.
•
Release the throttle (engine continues to idle)
•
Turn off the machine after completing operation
with the OFF-button.
CLEANING, MAINTENANCE, STORAGE, DISPOSAL
16.1
Cleaning
Regular cleaning guarantees the long service life of your machine and is a prerequisite for its safe
operation.
N OTE
Incorrect cleaning products can attack the finish of the machine. Do not use any
solvents, nitro thinners or other cleaning products that could damage the machine's
finish.
Observe the specifications and instructions of the cleaning agent manufacturer.
•
Remove chips and dirt particles from the machine after each use with a proper tool.
•
Prepare the surfaces and lubricate the bare machine parts with an acid-free lubricating oil
(e.g. WD40 rust inhibitor).
16.2
Maintenance
The machine is low-maintenance and only a few parts need to be serviced. Malfunctions or defects
that could affect your safety must be repaired immediately!
•
Before each operation, check the perfect condition of the safety devices.
•
Regularly check the perfect and legible condition of the warning and safety labels of the
machine.
•
Use only original spare parts recommended by the manufacturer.
Maintenance plan
The type and degree of machine wear depends to a large extent on the operating conditions. The
following intervals apply when the machine is used within the technical limits:
Interval
component
activity
for each usage
Band wheel bearing
Check for wear and if necessary replace it
Blade guide bearing
Check for wear and if necessary replace it
Log screws
Grease threads
Engine oil
Check oil-level
Air filter
Check for pollution and clean if necessary
After 20h and then all
100h
Engine oil
change
50h
Air filter
clean
100h
Spark plug
Change
2 years
Fuel supply lines
change
Содержание BBS810SMART-G
Страница 79: ...ZUBEHÖR ACCESSORIES HOLZMANN Maschinen GmbH www holzmann maschinen at 79 BB810SMART G ...
Страница 80: ...ZUBEHÖR ACCESSORIES HOLZMANN Maschinen GmbH www holzmann maschinen at 80 BB810SMART G ...
Страница 81: ...ZUBEHÖR ACCESSORIES HOLZMANN Maschinen GmbH www holzmann maschinen at 81 BB810SMART G ...
Страница 82: ...ZUBEHÖR ACCESSORIES HOLZMANN Maschinen GmbH www holzmann maschinen at 82 BB810SMART G ...